Power Systems When a transformer is loaded, the secondary terminal voltage gains. That means power factor is lagging. zero. unity. leading. lagging. zero. unity. leading. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Nuclear reactors usually employ both of A and B. fusion. fission. none of above. both of A and B. fusion. fission. none of above. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The function of draft tube is reaction turbine is to all of above. reduce water hammer. convert kinetic energy of water. increase flow rate of water. all of above. reduce water hammer. convert kinetic energy of water. increase flow rate of water. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The load current in short circuit calculations are neglected because short circuit currents are greatly out of phase with load currents short circuit currents are much larger than load currents nether 1 nor 2 both 1 and 2 short circuit currents are greatly out of phase with load currents short circuit currents are much larger than load currents nether 1 nor 2 both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Length of the cable is doubled, its capacitance C will be unchanged. doubled. one-fourth. one-half. unchanged. doubled. one-fourth. one-half. ANSWER DOWNLOAD EXAMIANS APP
Power Systems What are the methods of laying underground cables? Both A and B. Direct laying. None of these. Draw - in - system / duct - pipe laying. Both A and B. Direct laying. None of these. Draw - in - system / duct - pipe laying. ANSWER DOWNLOAD EXAMIANS APP