Power Systems A 100 MVA alternator operating at full load at 50 Hz. H = 4 MWsec/MVA, Td = 0.5 sec. One of the transmission line is tripped. So that output of generator is reduced to 70 MW. Find the frequency deviation during this time? -0.56 -0.92 0.56 0.92 -0.56 -0.92 0.56 0.92 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A loss less transmission line having surge impedance loading (SIL) of 2280 MW is provided with a uniformly distributed series capacitive compensation of 30 %. Then SIL of compensated transmission line will be 1835 MW. 2725 MW. 2280 MW. 3257 MW. 1835 MW. 2725 MW. 2280 MW. 3257 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following are the fissile materials U238 and Th232. None of these. U235 and Th239. U235, U233 and Pu239. U238 and Th232. None of these. U235 and Th239. U235, U233 and Pu239. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The Y bus matrix of 100 bus interconnected system is 90% sparse. Hence the number of transmission lines in the system must be 450 900 250 500 450 900 250 500 ANSWER DOWNLOAD EXAMIANS APP
Power Systems What is the approximate efficiency of a normal thermal power station? 30-40% 60-70% 45-55% 20-25% 30-40% 60-70% 45-55% 20-25% ANSWER DOWNLOAD EXAMIANS APP
Power Systems The voltage regulation of a line at full load 0.8 power factor is 11. A long transmission line under no load conditions, for a good voltage profile needs shunt reactor at receiving end shunt resistance at receiving end All of these shunt capacitor at receiving end shunt reactor at receiving end shunt resistance at receiving end All of these shunt capacitor at receiving end ANSWER DOWNLOAD EXAMIANS APP