Power Systems A 100 MVA alternator operating at full load at 50 Hz. H = 4 MWsec/MVA, Td = 0.5 sec. One of the transmission line is tripped. So that output of generator is reduced to 70 MW. Find the frequency deviation during this time? -0.92 0.92 -0.56 0.56 -0.92 0.92 -0.56 0.56 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station which has a high investment cost and low operating cost is usually operated as a Base load station. None of above. Minimum load station. Peak load station. Base load station. None of above. Minimum load station. Peak load station. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If we increase the length of the transmission line, the charging current remains unaffected increases decreases None of these remains unaffected increases decreases None of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems Find the value of a729, where "a" is the operator 1 α α² 0 1 α α² 0 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Bonding is done at the both ends of the cable to reduce the None of these copper loss sheath loss iron loss None of these copper loss sheath loss iron loss ANSWER DOWNLOAD EXAMIANS APP
Power Systems The amount of ash content in Indian coal 35 %. 45 %. 20 %. 60 %. 35 %. 45 %. 20 %. 60 %. ANSWER DOWNLOAD EXAMIANS APP