Power Systems A 100 MVA alternator operating at full load at 50 Hz. H = 4 MWsec/MVA, Td = 0.5 sec. One of the transmission line is tripped. So that output of generator is reduced to 70 MW. Find the frequency deviation during this time? -0.92 -0.56 0.92 0.56 -0.92 -0.56 0.92 0.56 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 1-phase transmission line has an impedance (3+4j) Ω . Find the power factor of the load for achieving maximum and zero voltage regulation? 0.6 lag and 0.6 lead 0.8 lag and 0.6 lead 0.8 lag and 0.8 lead 0.6 lag and 0.8 lead 0.6 lag and 0.6 lead 0.8 lag and 0.6 lead 0.8 lag and 0.8 lead 0.6 lag and 0.8 lead ANSWER DOWNLOAD EXAMIANS APP
Power Systems NTPC (National Thermal Power Cooperation) has its only thermal power generating unit in West Bengal at Katwa. Durgapur. Farakka. Bakreshwar. Katwa. Durgapur. Farakka. Bakreshwar. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following transmission line is most practically used in load flow analysis? nether 1 nor 2 either 1 or 2 Nominal ∏ Nominal T nether 1 nor 2 either 1 or 2 Nominal ∏ Nominal T ANSWER DOWNLOAD EXAMIANS APP
Power Systems Calorific value of solid fuel is expressed as Cal / gm. KCal / gm. KCal / lt. Cal / lt. Cal / gm. KCal / gm. KCal / lt. Cal / lt. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which power plant cannot have single unit of 100 MW capacity Hydro electric power plant. Steam power plant. Diesel engine plant. Nuclear power plant. Hydro electric power plant. Steam power plant. Diesel engine plant. Nuclear power plant. ANSWER DOWNLOAD EXAMIANS APP