• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Power Systems

Power Systems
Surge tank is kept very close to the

 generator
 pen stock
 turbine
 spill way

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
In a short circuit test circuit breaker, time to reach the peak re-striking voltage 60 microsecond & the peak re-striking voltage 120 kV. Determine average RRRV (Rate of rise re-striking voltage)?

  3 × 106 kV / sec.
 1 × 106 kV / sec.
  2 × 106 kV / sec.
 3.5 × 106 kV / sec.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
When a nuclear reaction is operating at constant power the multiplication factor is

 may be any of the above.
 less than 1.
  1.
 greater than 1.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
For harnessing low variable water heads, the suitable hydraulic turbine with reaction and adjustable vanes runners is

 Francis
 Kaplan
 Pelton
 Impeller

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
On what factor does the performance of a circuit breaker depend?

  None of these.
 Critical length of breaking.
  Both A and C.
  Breaking speed.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The line currents of 3-phase supply are: IR = 3 + j 5 A IY =2 + j 2 A IB = -2 - j 1 A The zero sequence current will be

 1 + j 4 A
 1 + j 2 A
 -2 - j 1 A
 5 + j 7 A

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑