Power Systems Surge tank is kept very close to the generator turbine pen stock spill way generator turbine pen stock spill way ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following will take least time in starting from cold condition to full load operation Thermal power plant. Hydro electric power plant. Nuclear power plant. Gas turbine plant. Thermal power plant. Hydro electric power plant. Nuclear power plant. Gas turbine plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Find the characteristic impedance of a transmission line, if impedance is 16 Ω and admittance is 0.1 mâ„§? 400 Ω 160 Ω 320 Ω 200 Ω 400 Ω 160 Ω 320 Ω 200 Ω ANSWER DOWNLOAD EXAMIANS APP
Power Systems Nuclear reactors usually employ fusion. none of above. both of A and B. fission. fusion. none of above. both of A and B. fission. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Making current is a------------ value? average peak value any of the above RMS average peak value any of the above RMS ANSWER DOWNLOAD EXAMIANS APP
Power Systems The positive, negative and zero sequence per unit impedance of two generators connected in parallel are X1 = 0.12 pu, X2 = 0.096 pu and X0 = 0.036 pu. For LG fault at generator terminals (with 1 pu voltage) the positive sequence current will be 9.936 pu 8.936 pu 7.936 pu 10.936 pu 9.936 pu 8.936 pu 7.936 pu 10.936 pu ANSWER DOWNLOAD EXAMIANS APP