Power Systems Surge tank is kept very close to the generator turbine pen stock spill way generator turbine pen stock spill way ANSWER DOWNLOAD EXAMIANS APP
Power Systems Critical mass is a mass of fissionable material required to stop a chain reaction. minimum mass of fissionable material required to sustain chain reaction. maximum mass of fissionable material required to sustain a chain reaction. none of these. a mass of fissionable material required to stop a chain reaction. minimum mass of fissionable material required to sustain chain reaction. maximum mass of fissionable material required to sustain a chain reaction. none of these. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The water from a catchment is 60*106 cu m annually and hydro station has head of 40 m. Assuming ideal generator and turbine, the power that can be theoretically generated is 250 kW 750 kW 500 kW 300 kW 250 kW 750 kW 500 kW 300 kW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following will take least time in starting from cold condition to full load operation Nuclear power plant. Thermal power plant. Hydro electric power plant. Gas turbine plant. Nuclear power plant. Thermal power plant. Hydro electric power plant. Gas turbine plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems To prevent maloperation of deferentially connected relay while energizing a transformer, the relay restraining coil is biased with 7th harmonic current. 5th harmonic current. 2nd harmonic current. 3rd harmonic current. 7th harmonic current. 5th harmonic current. 2nd harmonic current. 3rd harmonic current. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The power generated by two plants are; P1 = 50 MW, P2 = 40 MW. If the loss coefficients are B11 = 0.001, B22 = 0.0025 and B12 = -0.0005, then power loss will be 6.5 MW 8.5 MW 5.5 MW 4.5 MW 6.5 MW 8.5 MW 5.5 MW 4.5 MW ANSWER DOWNLOAD EXAMIANS APP