Power Systems India 1st nuclear plant was set up at Kalpakkam. Rana pratap sagar. Bhaba. Tarapur. Kalpakkam. Rana pratap sagar. Bhaba. Tarapur. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The zero sequence current of a generator for line to ground fault is j3 pu. Then the current through the neutral during the fault is j3 pu j9 pu j6 pu j1 pu j3 pu j9 pu j6 pu j1 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems Pelton turbine is a ----------- turbine inward radial flow axial flow impulsive any of the above inward radial flow axial flow impulsive any of the above ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 4 bus power system consists of 4 transmission lines, then find the sparsity of Y bus matrix? 0.4 0.75 0.5 0.25 0.4 0.75 0.5 0.25 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Maximum power capacity of a transmission line can be increased by nether 1 nor 2 decreasing reactance value increasing voltage level either 1 or 2 nether 1 nor 2 decreasing reactance value increasing voltage level either 1 or 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Gas coolled reactor both B and C. use coolant at pressure of 14-28 Kg/cm2 and at temperature of 700°-800° c. use CO2. or helium as coolant and graphite the moderator. use heavy water as coolant as well as moderator. both B and C. use coolant at pressure of 14-28 Kg/cm2 and at temperature of 700°-800° c. use CO2. or helium as coolant and graphite the moderator. use heavy water as coolant as well as moderator. ANSWER DOWNLOAD EXAMIANS APP