Power Systems India 1st nuclear plant was set up at Rana pratap sagar. Tarapur. Kalpakkam. Bhaba. Rana pratap sagar. Tarapur. Kalpakkam. Bhaba. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Making current is a------------ value? peak value RMS average any of the above peak value RMS average any of the above ANSWER DOWNLOAD EXAMIANS APP
Power Systems For a fixed value of complex power flow in a transmission line having a sending end voltage V, the real power loss will be proportional to V2. V. 1 / V. 1 / V2. V2. V. 1 / V. 1 / V2. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power generating station has a maximum demand of 1000 MW. The annual load factor is 75% and plant capacity factor is 60%. Calculate the reserve capacity? 1250 MW 750 MW 250 MW 500 MW 1250 MW 750 MW 250 MW 500 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Fault calculations using computer are usually done by either 1 or 2 Z bus method Y bus method None of these either 1 or 2 Z bus method Y bus method None of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems How to find the total number of strands (N) when number of layers (x) are given Total number of strands N = 3x² + 3x + 1 Total number of strands N = 3x² - 3x - 1 Total number of strands N = 3x² + 3x - 1 Total number of strands N = 3x² - 3x + 1 Total number of strands N = 3x² + 3x + 1 Total number of strands N = 3x² - 3x - 1 Total number of strands N = 3x² + 3x - 1 Total number of strands N = 3x² - 3x + 1 ANSWER DOWNLOAD EXAMIANS APP