Power Systems India 1st nuclear plant was set up at Rana pratap sagar. Kalpakkam. Bhaba. Tarapur. Rana pratap sagar. Kalpakkam. Bhaba. Tarapur. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 200 MW capacity generator has a speed regulation of 4% for a frequency drop of 0.05 Hz. Find the power input supplied by the turbine for maintaining constant frequency? 5 MW 20 MW 10 MW 15 MW 5 MW 20 MW 10 MW 15 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems The positive sequence reactance will be equal to negative sequence if the equipment is transformer and transmission lines. none of these. generator. motor. transformer and transmission lines. none of these. generator. motor. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Find the propagation constant, if impedance is 10Ω and admittance is 10 â„§? 1 5 100 10 1 5 100 10 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The charging current of a 400 kV line is more than that of a 220 kV line of the same length? True False None of these either 1 or 2 True False None of these either 1 or 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems In Rankine cycle, the work output from a turbine is given by change in temperature between inlet and outlet. change in internal energy between inlet and outlet. change of entropy between inlet and outlet. change of enthalpy between inlet and outlet. change in temperature between inlet and outlet. change in internal energy between inlet and outlet. change of entropy between inlet and outlet. change of enthalpy between inlet and outlet. ANSWER DOWNLOAD EXAMIANS APP