Power Systems India 1st nuclear plant was set up at Kalpakkam. Bhaba. Tarapur. Rana pratap sagar. Kalpakkam. Bhaba. Tarapur. Rana pratap sagar. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Critical disruptive voltage is a voltage at which nether 1 nor 2 both 1 and 2 corona is just initiated corona is visible with blue or violet colour nether 1 nor 2 both 1 and 2 corona is just initiated corona is visible with blue or violet colour ANSWER DOWNLOAD EXAMIANS APP
Power Systems The voltage regulation of a line at full load 0.8 power factor is 11. A long transmission line under no load conditions, for a good voltage profile needs shunt resistance at receiving end All of these shunt reactor at receiving end shunt capacitor at receiving end shunt resistance at receiving end All of these shunt reactor at receiving end shunt capacitor at receiving end ANSWER DOWNLOAD EXAMIANS APP
Power Systems Proximity effect is more in case of None of these over head lines power cables same in both cases None of these over head lines power cables same in both cases ANSWER DOWNLOAD EXAMIANS APP
Power Systems The function of moderator in a nuclear reactor is to absorb the excess. All of these to slow down the neutrons. to increase the energy of the neutrons. to absorb the excess. All of these to slow down the neutrons. to increase the energy of the neutrons. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generated station has a maximum demand of 30 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is 10 MW 6 MW 12 MW 5 MW 10 MW 6 MW 12 MW 5 MW ANSWER DOWNLOAD EXAMIANS APP