Power Systems India 1st nuclear plant was set up at Bhaba. Rana pratap sagar. Tarapur. Kalpakkam. Bhaba. Rana pratap sagar. Tarapur. Kalpakkam. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Maximum power capacity of a transmission line can be increased by decreasing reactance value increasing voltage level nether 1 nor 2 either 1 or 2 decreasing reactance value increasing voltage level nether 1 nor 2 either 1 or 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A string insulator has 4 units. The voltage across the bottom most unit is 33.33% of total voltage. Its string efficiency is 33.33% 75% 66.66% 25% 33.33% 75% 66.66% 25% ANSWER DOWNLOAD EXAMIANS APP
Power Systems Lightning arresters are used for All of these protection of equipment from external lightning protection of equipment from open circuits protection of equipment from short circuits All of these protection of equipment from external lightning protection of equipment from open circuits protection of equipment from short circuits ANSWER DOWNLOAD EXAMIANS APP
Power Systems Gross head of an hydroelectric power station is the difference of water level between the level in storage and tail race. all of above. the height of water level in the river where the storage is provided. the height of water level in the river where the tail race is provided. the difference of water level between the level in storage and tail race. all of above. the height of water level in the river where the storage is provided. the height of water level in the river where the tail race is provided. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Storage requirement can be determined from mass Curve. flow duration curve. both B and C. hydro-graph. mass Curve. flow duration curve. both B and C. hydro-graph. ANSWER DOWNLOAD EXAMIANS APP