Power Systems India 1st nuclear plant was set up at Rana pratap sagar. Bhaba. Tarapur. Kalpakkam. Rana pratap sagar. Bhaba. Tarapur. Kalpakkam. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For a 500 Hz frequency excitation, a 100 km long power line will be modelled as shunt capacitor any of the above long transmission line medium transmission line shunt capacitor any of the above long transmission line medium transmission line ANSWER DOWNLOAD EXAMIANS APP
Power Systems A load centre is at an equidistant from the two thermal generating stations G1 and G2. The fuel cost characteristics of the generating stations are given by F1 = a + bP1 + cP²1 F2 = a + b P2 + 2cP²2 Where P1 and P2 are the generation in MW of G1 and G2, respectively. For most economic generation to meet 300 MW of load, P1 and P2 respectively, are 100, 200 200, 100 175, 125 150, 150 100, 200 200, 100 175, 125 150, 150 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Specified quantities of slack bus are P and δ P and Q V and δ P and V P and δ P and Q V and δ P and V ANSWER DOWNLOAD EXAMIANS APP
Power Systems The commercial sources of energy are solar, wind, biomass. none of above. wood, animal wastes and agricultural wastes. fossile fuels and radioactive substances. solar, wind, biomass. none of above. wood, animal wastes and agricultural wastes. fossile fuels and radioactive substances. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 20 MVA generator has inertia constant of 0.5 pu. Find new value for 50 MVA base? 0.1 pu 0.2 pu 0.5 pu 0.4 pu 0.1 pu 0.2 pu 0.5 pu 0.4 pu ANSWER DOWNLOAD EXAMIANS APP