Power Systems India 1st nuclear plant was set up at Bhaba. Rana pratap sagar. Kalpakkam. Tarapur. Bhaba. Rana pratap sagar. Kalpakkam. Tarapur. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Plug setting of a relay can be altered by varying none of these. no. of ampere-turns. adjustable back up stop. air gap of magnetic path. none of these. no. of ampere-turns. adjustable back up stop. air gap of magnetic path. ANSWER DOWNLOAD EXAMIANS APP
Power Systems MCB stands for minimum capacity breaker. molded circuit breaker. miniature circuit breaker. maximum capacity breaker. minimum capacity breaker. molded circuit breaker. miniature circuit breaker. maximum capacity breaker. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a 400 kV power network, 360 kV is recorded at 400 kV bus. The reactive power absorbed by a shunt reactor for 50 MVAr, 400 kV connected at the bus is 40.5 MVAr. 55.56 MVAr. 45.0 MVAr. 61.73 MVAr. 40.5 MVAr. 55.56 MVAr. 45.0 MVAr. 61.73 MVAr. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Storage requirement can be determined from hydro-graph. both B and C. flow duration curve. mass Curve. hydro-graph. both B and C. flow duration curve. mass Curve. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In coal fired thermal power stations, what are the electrostatic precipitators used for? To keep the air heaters clean To remove dust particles setting on the bus bar conductors in the station switch yard To collect the dust particles from the flue gases All of these To keep the air heaters clean To remove dust particles setting on the bus bar conductors in the station switch yard To collect the dust particles from the flue gases All of these ANSWER DOWNLOAD EXAMIANS APP