• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Power Systems

Power Systems
India 1st nuclear plant was set up at

  Rana pratap sagar.
  Kalpakkam.
  Bhaba.
  Tarapur.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
In a 4 bus,4×4 Y bus matrix the number of non zero elements are 12. Find the number of transmission lines?

 4
 2
 8
 5

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
In a regenerative cycle, feed water is heated by

  drained steam from turbine.
 all of above.
 exhaust gas.
 heaters.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The main objectives of power system is/are

All of these
 Cost of electrical energy per KWh is to be minimum
 Flexible power has to be available.
 Reliable power has to be available

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Attenuation occurs due to

 inductance
 conductance
 both 1 and 3
 resistance

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A 60 Hz, 320 Km loss less line has sending end voltage 1.0 pu. The receiving end voltage on no-load is

 1.116 pu.
 none of these.
 1.1 pu.
  1.088 pu.

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑