• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Power Systems

Power Systems
India 1st nuclear plant was set up at

  Kalpakkam.
  Tarapur.
  Rana pratap sagar.
  Bhaba.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Reflector of a nuclear reactor are made up of

 steel.
 cast iron.
  boron.
  beryllium.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
String efficiency depends upon

 no. of SCR in the string.
 voltage rating of whole string.
  all of these.
 voltage rating of one SCR.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
In a Gauss Seidel load flow method, the number of iterations may be reduced if the correction in voltage at each bus is multiplied by

 Gauss constant
 Lagrange multiplier
 Acceleration factor
 Blocking factor

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The sequence components of the fault current are as follows : Ipositive = j1.5 pu, Inegative = − j0.5 pu, Izero = − j pu Which fault is this?

  LLLG.
  LG.
  LL.
  LLG.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which of the following plants has the maximum eapital cost

 Hydro-plants.
  Nuclear plants.
 Diesel plants.
 Steam plants.

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑