Power Systems India 1st nuclear plant was set up at Tarapur. Bhaba. Kalpakkam. Rana pratap sagar. Tarapur. Bhaba. Kalpakkam. Rana pratap sagar. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a short circuit test circuit breaker, time to reach the peak re-striking voltage 60 microsecond & the peak re-striking voltage 120 kV. Determine average RRRV (Rate of rise re-striking voltage)? 3 × 106 kV / sec. 1 × 106 kV / sec. 2 × 106 kV / sec. 3.5 × 106 kV / sec. 3 × 106 kV / sec. 1 × 106 kV / sec. 2 × 106 kV / sec. 3.5 × 106 kV / sec. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is an impulse turbine Pelton turbine. None of above. Kaplan turbine. Francis turbine. Pelton turbine. None of above. Kaplan turbine. Francis turbine. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The specific speed ( NS ) of turbine is given by N√( P ) / H1.25. none of these. N√( P ) / H2/3. P√( N ) / H3/2. N√( P ) / H1.25. none of these. N√( P ) / H2/3. P√( N ) / H3/2. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The SWR on a lossless transmission line of the characteristic impedance 100 ohm is 3. The line is the terminated by A resistance of j100/3 ohm. A resistance of 100/3 ohm. A resistance of j300 ohm. A resistance of 100 ohm. A resistance of j100/3 ohm. A resistance of 100/3 ohm. A resistance of j300 ohm. A resistance of 100 ohm. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Thermal shielding is provided to protected the operating personal from exposure to radiations. All of these absorb the fast neutron. prevent the reactor wall from getting heated. protected the operating personal from exposure to radiations. All of these absorb the fast neutron. prevent the reactor wall from getting heated. ANSWER DOWNLOAD EXAMIANS APP