• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Power Systems

Power Systems
India 1st nuclear plant was set up at

  Tarapur.
  Kalpakkam.
  Bhaba.
  Rana pratap sagar.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The power output from an hydroelectric plants depend on

 type of turbine, type of dam and type of catchment area.
  discharge, system efficiency.
 type of dam, head, system efficiency.
 type of dam, type of catchment area and discharge.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which of the following statements is/are true regarding HVDC?

 There is no skin effect in dc line
All of these
 Corona loss is very much reduced in the dc line
 HVDC can utilize earth for its return path

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
In a nuclear reator thermal energy is obtained from

 burning of fuel rods in oxygen.
 all of above.
 fusion of radioactive material.
  fission of radioactive material.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Buchholz relay is used for protection of

  alternator.
  transformer.
  none of these.
  bus bar.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Condition for maximum voltage regulation

 cosφ = R/X
 cosφ = X/R
 tanφ = X/R
 tanφ = R/X

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑