Power Systems India 1st nuclear plant was set up at Rana pratap sagar. Tarapur. Kalpakkam. Bhaba. Rana pratap sagar. Tarapur. Kalpakkam. Bhaba. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Ferranti effect occurs under half load no load full load any of the above half load no load full load any of the above ANSWER DOWNLOAD EXAMIANS APP
Power Systems Critical disruptive voltage is a voltage at which corona is just initiated both 1 and 2 corona is visible with blue or violet colour nether 1 nor 2 corona is just initiated both 1 and 2 corona is visible with blue or violet colour nether 1 nor 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems In transmission lines distribution constants are both 1 and 2 inductance and capacitance resistance inductance and resistance both 1 and 2 inductance and capacitance resistance inductance and resistance ANSWER DOWNLOAD EXAMIANS APP
Power Systems A lossless power system has to serve a load of 250 MW. There are two generators(G1 and G2) in the system with cost curves C1 and C2 respectively defined as follows: C1 = PG1+0.055P²G1 C2 = 3 PG2 + 0.03 P²G2 Where PG1 and PG2 are the MW injections from generators G1 and G2 respectively. Thus, the minimum cost dispatch will be PG1 = 100 MW and PG2 = 150 MW PG1 = 250 MW and PG2 = 0 MW PG1 = 0 MW and PG2 = 250 MW PG1 = 150 MW and PG2 = 100 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 250 MW and PG2 = 0 MW PG1 = 0 MW and PG2 = 250 MW PG1 = 150 MW and PG2 = 100 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is used in thermal plants Otto cycle All of these Rankine cycle Joule cycle Otto cycle All of these Rankine cycle Joule cycle ANSWER DOWNLOAD EXAMIANS APP