• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Power Systems

Power Systems
India 1st nuclear plant was set up at

  Kalpakkam.
  Rana pratap sagar.
  Tarapur.
  Bhaba.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The capacitance of an overhead transmission line increases with

 neither 1 nor 2
 both 1 and 2
 increase in mutual geometrical mean distance
 increase in height of conductors above ground

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A 1-phase transmission line has an impedance (4 + 3j ) Ω. Find the power factor of the load for zero voltage regulation?

 0.6 lead
 0.6 lag
 0.8 lead
 0.8 lag

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Bonding is done at the both ends of the cable to reduce the

 sheath loss
 copper loss
None of these
 iron loss

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
In a 220 kV system, the inductance and capacitance up to the circuit breaker location are 25 mH and 0.025 µF respectively. The value of resistor required to be connected across the breaker contacts which will give no transient oscillations, is

 1000 Ω
 250 Ω
 500 Ω
 25 Ω

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Storage requirement can be determined from

 hydro-graph.
 flow duration curve.
 mass Curve.
  both B and C.

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑