Power Systems India 1st nuclear plant was set up at Bhaba. Rana pratap sagar. Kalpakkam. Tarapur. Bhaba. Rana pratap sagar. Kalpakkam. Tarapur. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Transmission line has a length of 300 km, operating at sending end voltage Vs = 1 pu, find the receiving end voltage(Vr) at no load? 0.098 pu 0.98 pu 1.098 pu 1 pu 0.098 pu 0.98 pu 1.098 pu 1 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems The total number of strands in a ACSR conductor are 7, then find the layer number? 3 2 5 7 3 2 5 7 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power generating station has a plant capacity of 200 MW and maximum power demand is 150 MW. If average power generation is 110 MW, then find the load factor and capacity factor respectively? 0.733 and 0.65 0.733 and 0.55 0.55 and 0.733 0.65 and 0.55 0.733 and 0.65 0.733 and 0.55 0.55 and 0.733 0.65 and 0.55 ANSWER DOWNLOAD EXAMIANS APP
Power Systems One atomic mass unit is equivalent to 931.4 MeV. 180.5 MeV. 251.2 MeV. 120.4 MeV. 931.4 MeV. 180.5 MeV. 251.2 MeV. 120.4 MeV. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Where do compounding done in thermal power plants Turbine. Ash handling plant. Coal handling plant. Generator. Turbine. Ash handling plant. Coal handling plant. Generator. ANSWER DOWNLOAD EXAMIANS APP