Power Systems

Power Systems
India 1st nuclear plant was set up at

  Tarapur.
  Rana pratap sagar.
  Kalpakkam.
  Bhaba.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The capacitance of an overhead transmission line increases with

 both 1 and 2
 increase in height of conductors above ground
 neither 1 nor 2
 increase in mutual geometrical mean distance

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
In a 3-phase, 5 kV, 5 MVA system, what is the base impedance?

 500 ohms
 5 ohms
 0.5 ohm
 50 ohms

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The load current in short circuit calculations are neglected because

 both 1 and 2
 nether 1 nor 2
 short circuit currents are greatly out of phase with load currents
 short circuit currents are much larger than load currents

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
More efficient plants are used as

 peak load plant
 base load plant
 both 1 and 2
None of these

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The total number of strands(N) is concentrically stranded cable with total annular space filled with strands of uniform diameter is given by (if x is number of layers)

 N = 3x²-6x+1
 N = 3x²-3x+1
 N = 3x²+3x+1
 N = 3x²-2x+1

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑