India 1st nuclear plant was set up at

  Rana pratap sagar.
  Bhaba.
  Tarapur.
  Kalpakkam.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
If the rated receiving end voltage is 33 kV, then what are the limits for safe operation of equipments?

 31.35 to 34.65 kV
 33 to 50 kV
 25 to 35 kV
 any voltage above 33 kV

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The use of high speed circuit breakers

  improves system stability.
 reduces the short circuit current.
 increased the short circuit current.
 decrease system stability.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A hydraulic turbine having rated speed of 250 rpm is connected to a synchronous generator. In order to produce power at 50 Hz, the numbers of pole are required in the generator

 12.
 16.
  24.
 6.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Pumped storage plant is a

 both 1 and 2
None of these
 base load plant
 peak load plant

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A 3 layer and diameter of each strand is d, then find the total diameter of ACSR conductor?

 d
 2d
 5d
 3d

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑