Power Systems Based on the discharge, Kaplan turbine will discharge >10000 lpm 1000 lpm >10000 lpm 1000 lpm ANSWER DOWNLOAD EXAMIANS APP
Power Systems A lossless power system has to serve a load of 250 MW. There are two generators(G1 and G2) in the system with cost curves C1 and C2 respectively defined as follows: C1 = PG1+0.055P²G1 C2 = 3 PG2 + 0.03 P²G2 Where PG1 and PG2 are the MW injections from generators G1 and G2 respectively. Thus, the minimum cost dispatch will be PG1 = 100 MW and PG2 = 150 MW PG1 = 150 MW and PG2 = 100 MW PG1 = 250 MW and PG2 = 0 MW PG1 = 0 MW and PG2 = 250 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 150 MW and PG2 = 100 MW PG1 = 250 MW and PG2 = 0 MW PG1 = 0 MW and PG2 = 250 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems The essential requirement(s) for power plants to be operated as peak load plants are Low capital cost. Quick response to load variation. Capability of quick starts. All of these Low capital cost. Quick response to load variation. Capability of quick starts. All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems Frequencies must be same in which of the following line to exchange the power from one place to other place ? both 1 and 2 No need of same frequency for exchange of power Synchronous line Asynchronous line both 1 and 2 No need of same frequency for exchange of power Synchronous line Asynchronous line ANSWER DOWNLOAD EXAMIANS APP
Power Systems In transmission lines distribution constants are inductance and resistance both 1 and 2 inductance and capacitance resistance inductance and resistance both 1 and 2 inductance and capacitance resistance ANSWER DOWNLOAD EXAMIANS APP
Power Systems The draw back of NR method as compare to Gauss-Seidel method is/are? large number of iterations None of these both 1 and 2 large requirement of computer memory large number of iterations None of these both 1 and 2 large requirement of computer memory ANSWER DOWNLOAD EXAMIANS APP