Power Systems Based on the discharge, Kaplan turbine will discharge >10000 lpm 1000 lpm >10000 lpm 1000 lpm ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a two plant system, the load is connected to plant number 2. The loss coefficients are B11 is non zero,B22 = B12 = 0 B11,B12 are non zero ,B22 = 0 B11,B22 are non zero,B12 = 0 B11,B22,B12 are non zeros B11 is non zero,B22 = B12 = 0 B11,B12 are non zero ,B22 = 0 B11,B22 are non zero,B12 = 0 B11,B22,B12 are non zeros ANSWER DOWNLOAD EXAMIANS APP
Power Systems The load duration curve for a system is 8 hours 30 MW, 16 hours 25 MW and 24 hours 20 MW. The load factor will be 1.3. 0.44. 0.83. 0.25. 1.3. 0.44. 0.83. 0.25. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following statements are true? both 1 and 2 Bus impedance matrix is a full matrix Bus admittance matrix is a sparse matrix nether 1 nor 2 both 1 and 2 Bus impedance matrix is a full matrix Bus admittance matrix is a sparse matrix nether 1 nor 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following represents the sag(S) of a transmission line? S = wl²/8T S = wl²/16T S = wl²/4T S = wl²/2T S = wl²/8T S = wl²/16T S = wl²/4T S = wl²/2T ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 1- phase transmission line operating at 30 kV has radius of 1 cm and distance between conductors is 0.5 m. Assume m = δ =1, g = 21 kV/cm and frequency f = 50 Hz. Find the critical disruptive voltage? 41.075 kV/phase 34.64 kV/phase 17.32 kV/phase 82.15 kV/phase 41.075 kV/phase 34.64 kV/phase 17.32 kV/phase 82.15 kV/phase ANSWER DOWNLOAD EXAMIANS APP