Power Systems Based on the discharge, Kaplan turbine will discharge 1000 lpm >10000 lpm 1000 lpm >10000 lpm ANSWER DOWNLOAD EXAMIANS APP
Power Systems The generating station suitable to operate as peak load plant is Thermal power station. Pumped storage. Power station. Nuclear power station. Thermal power station. Pumped storage. Power station. Nuclear power station. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following are the fissile materials U238 and Th232. U235 and Th239. None of these. U235, U233 and Pu239. U238 and Th232. U235 and Th239. None of these. U235, U233 and Pu239. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Advantages of pumped storage plants is/are operating time is minimum used as load frequency control most economical as a peak load supply plant All of these operating time is minimum used as load frequency control most economical as a peak load supply plant All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems If a 500 MVA, 11 kV 3-phase generator at 50 Hz feeds through a transfer impedance of (0+j0.605) Ω/phase, an infinite voltage also at 11 kV, then the maximum steady state power transfer on the base of 500 MVA and 11 kV is 0.8 pu 0.5 pu 1 pu 0.4 pu 0.8 pu 0.5 pu 1 pu 0.4 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems A lossless power system has to serve a load of 250 MW. There are two generators(G1 and G2) in the system with cost curves C1 and C2 respectively defined as follows: C1 = PG1+0.055P²G1 C2 = 3 PG2 + 0.03 P²G2 Where PG1 and PG2 are the MW injections from generators G1 and G2 respectively. Thus, the minimum cost dispatch will be PG1 = 250 MW and PG2 = 0 MW PG1 = 0 MW and PG2 = 250 MW PG1 = 150 MW and PG2 = 100 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 250 MW and PG2 = 0 MW PG1 = 0 MW and PG2 = 250 MW PG1 = 150 MW and PG2 = 100 MW PG1 = 100 MW and PG2 = 150 MW ANSWER DOWNLOAD EXAMIANS APP