Power Systems Two generating stations delivering a powers of P1 = 150 MW, P2 =100 MW and the B coefficients are B11 = 0.005, B22 = 0.002, B12=B21= -0.001. Find the transmission line losses? 85.5 95.5 105.2 102.5 85.5 95.5 105.2 102.5 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A coal fired steam power station working at a plant factor of 80% has one 500 MW generating unit. If the heat content of coal is 2 kWh/kg, the overall plant efficiency is 40% and a train load of coal is 2000 metric tons, then the number of trains required daily for the plant is 16 2 10 6 16 2 10 6 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A loss less transmission line having surge impedance loading (SIL) of 2280 MW is provided with a uniformly distributed series capacitive compensation of 30 %. Then SIL of compensated transmission line will be 2280 MW. 3257 MW. 1835 MW. 2725 MW. 2280 MW. 3257 MW. 1835 MW. 2725 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The essential requirement(s) for power plants to be operated as peak load plants are Low capital cost. All of these Quick response to load variation. Capability of quick starts. Low capital cost. All of these Quick response to load variation. Capability of quick starts. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The most commonly used material for insulators of overhead lines is glass PVC porcelain mica glass PVC porcelain mica ANSWER DOWNLOAD EXAMIANS APP
Power Systems Ships are usually supplied power by Hydraulic turbine. Steam accumulator. None of above. Diesel engine. Hydraulic turbine. Steam accumulator. None of above. Diesel engine. ANSWER DOWNLOAD EXAMIANS APP