Power Systems
Two generating stations delivering a powers of P1 = 150 MW, P2 =100 MW and the B coefficients are B11 = 0.005, B22 = 0.002, B12=B21= -0.001. Find the transmission line losses?

 85.5
 95.5
 102.5
 105.2

ANSWER DOWNLOAD EXAMIANS APP