Power Systems A power station has a maximum demand of 15 MW. The plant capacity is 20 MW. Find the reserve capacity of the plant? 10 MW 20 MW 5 MW 15 MW 10 MW 20 MW 5 MW 15 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems The ABCD constants of a 3-phase transmission line are A = D = 0.8∠1°, B = 170∠85° Ω , C = 0.002∠90.4° â„§. The sending end voltage is 400 kV. The receiving end voltage under no load condition is 400 kV 350 kV 600 kV 500 kV 400 kV 350 kV 600 kV 500 kV ANSWER DOWNLOAD EXAMIANS APP
Power Systems Making current is a------------ value? any of the above RMS peak value average any of the above RMS peak value average ANSWER DOWNLOAD EXAMIANS APP
Power Systems Efficiency of thermal power plant can be taken as efficiency of thermal cycle. turbine efficiency. generator efficiency. product of efficiencies of all stages. efficiency of thermal cycle. turbine efficiency. generator efficiency. product of efficiencies of all stages. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a 4*4 Y bus matrix the number of non zero elements are 12. Find the sparsity of the system? 0.25 1 0.75 0.5 0.25 1 0.75 0.5 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station has a maximum demand of 50 MW a load factor of 60 %, a plant capacity factor of 45 % and if the plant while running as per schedule were fully loaded. The daily energy produced will be 710 MW. 740 MW. 730 MW. 720 MW. 710 MW. 740 MW. 730 MW. 720 MW. ANSWER DOWNLOAD EXAMIANS APP