Power Systems A power station has a maximum demand of 15 MW. The plant capacity is 20 MW. Find the reserve capacity of the plant? 15 MW 5 MW 10 MW 20 MW 15 MW 5 MW 10 MW 20 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Under over excitation synchronous phase modifier works as shunt reactor shunt capacitor series capacitor any of the above shunt reactor shunt capacitor series capacitor any of the above ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the breakdown voltage of the insulator is high, the thickness of the insulator is it does not related to breakdown voltage None of these less high it does not related to breakdown voltage None of these less high ANSWER DOWNLOAD EXAMIANS APP
Power Systems Gross head of an hydroelectric power station is the difference of water level between the level in storage and tail race. the height of water level in the river where the tail race is provided. the height of water level in the river where the storage is provided. all of above. the difference of water level between the level in storage and tail race. the height of water level in the river where the tail race is provided. the height of water level in the river where the storage is provided. all of above. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For n bus power system size of Y bus matrix is (n-1)×(n-1) n×n (n-2)×(n-2) (n-1)×(n-2) (n-1)×(n-1) n×n (n-2)×(n-2) (n-1)×(n-2) ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 200 MW capacity generator has a speed regulation of 4% for a frequency drop of 0.05 Hz. Find the power input supplied by the turbine for maintaining constant frequency? 20 MW 15 MW 5 MW 10 MW 20 MW 15 MW 5 MW 10 MW ANSWER DOWNLOAD EXAMIANS APP