In kaplan runner, the number of blades is generally of the order of

  16 - 24.
  3 - 6.
 12 - 16.
 1 - 2.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
An isolated synchronous generator with transient reactance equal to 0.1 pu on a 100 MVA base is connected to the high voltage bus through a step up transformer of reactance 0.1 pu on a 100 MVA base. The fault level at the bus is

 500 MVA
 400 MVA
 100 MVA
 200 MVA

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Advantages of pumped storage plants is/are

 used as load frequency control
All of these
 most economical as a peak load supply plant
 operating time is minimum

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which of the following will take least time in starting from cold condition to full load operation

 Thermal power plant.
 Nuclear power plant.
  Hydro electric power plant.
 Gas turbine plant.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
In Francis turbine runner, the number blades is usually of the order of

 6 - 8.
 3 - 6.
  16 - 24.
 12 - 14.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The corona loss on a particular system at 60 Hz is 1 kW/km per phase. What is the corona loss at 50 Hz in kW/km per phase?

 0.882
 1
 1.13
 0.93

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑