A gas turbine power plant is best suited for

 Base load.
 Peak load.
 None of these.
 Emergency.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Advantage/s of per unit system as compare to absolute system?

 calculation time is less
All of these
 memory required is less
 only one equation is required

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The specific speed ( NS ) of turbine is given by

 N√( P ) / H2/3.
 P√( N ) / H3/2.
  N√( P ) / H1.25.
 none of these.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
An over current relay, having a current setting of 125% connected to a supply circuit through a current transformer of ratio 400/5. The pick up value is

 15 A
 10 A
 6.25 A
 12.5 A

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Most commonly used material for insulator is

 porcelain
 mica
All of these
 glass

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
In a short circuit test circuit breaker, time to reach the peak re-striking voltage 60 microsecond & the peak re-striking voltage 120 kV. Determine average RRRV (Rate of rise re-striking voltage)?

  3 × 106 kV / sec.
 3.5 × 106 kV / sec.
 1 × 106 kV / sec.
  2 × 106 kV / sec.

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑