Power Systems A gas turbine power plant is best suited for Emergency. Base load. None of these. Peak load. Emergency. Base load. None of these. Peak load. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The rating of fuse wire is always expressed in ampere-volts. ampere-hours. amperes. kWh. ampere-volts. ampere-hours. amperes. kWh. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The generating station suitable to operate as peak load plant is Power station. Nuclear power station. Thermal power station. Pumped storage. Power station. Nuclear power station. Thermal power station. Pumped storage. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following methods is/are used for reactive or voltage compensation All of these generation excitation control series capacitor shunt capacitor All of these generation excitation control series capacitor shunt capacitor ANSWER DOWNLOAD EXAMIANS APP
Power Systems Mechanical energy is supplied to a DC generator at the rate of 4200 J / S. The generator delivers 32.2 Amp at 120 V. How much energy is cost per minute of operation 20160 J. 25060 J. 23060 J. 20060 J. 20160 J. 25060 J. 23060 J. 20060 J. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Frequencies must be same in which of the following line to exchange the power from one place to other place ? No need of same frequency for exchange of power Synchronous line both 1 and 2 Asynchronous line No need of same frequency for exchange of power Synchronous line both 1 and 2 Asynchronous line ANSWER DOWNLOAD EXAMIANS APP