Power Systems A gas turbine power plant is best suited for None of these. Emergency. Peak load. Base load. None of these. Emergency. Peak load. Base load. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is/are base load plants? nuclear plants thermal plants hydro plants All of these nuclear plants thermal plants hydro plants All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems The overall efficiency of a steam power plant equal to binary vapor cycle. regenerative cycle. the Rankine cycle. product of boiler efficiency, turbine efficiency and generator efficiency. binary vapor cycle. regenerative cycle. the Rankine cycle. product of boiler efficiency, turbine efficiency and generator efficiency. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal generating station has an installed capacity of 15 MW and supplies a daily load of 10 MW for 12 hours and 5 MW for remaining 12 hours. If the load factor is 0.8. Find the reserve capacity of the station? 10 MW 18 MW 9 MW 5 MW 10 MW 18 MW 9 MW 5 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems IF the time of operation of a relay for unity TMS is 10 sec then the time of operation for 0.5 TMS is 10 sec. 5 sec. none of these. 20 sec. 10 sec. 5 sec. none of these. 20 sec. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For which one of the following types of motors, is the equal area criterion for stability applicable? DC shunt motor DC series motor Three phase synchronous motor Three phase induction motor DC shunt motor DC series motor Three phase synchronous motor Three phase induction motor ANSWER DOWNLOAD EXAMIANS APP