Power Systems A gas turbine power plant is best suited for Emergency. Base load. Peak load. None of these. Emergency. Base load. Peak load. None of these. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a pressurized water reactor heavy water is used as both coolant and moderator. both B and C. the coolant water boils in the reactor core. water is used at high pressure so that it is available is liquid from at about 280° C. heavy water is used as both coolant and moderator. both B and C. the coolant water boils in the reactor core. water is used at high pressure so that it is available is liquid from at about 280° C. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Normally Z bus matrix is a null matrix sparse matrix unit matrix full matrix null matrix sparse matrix unit matrix full matrix ANSWER DOWNLOAD EXAMIANS APP
Power Systems Breaking current is a ------------------ value? maximum RMS any of the above average maximum RMS any of the above average ANSWER DOWNLOAD EXAMIANS APP
Power Systems To prevent maloperation of deferentially connected relay while energizing a transformer, the relay restraining coil is biased with 3rd harmonic current. 5th harmonic current. 2nd harmonic current. 7th harmonic current. 3rd harmonic current. 5th harmonic current. 2nd harmonic current. 7th harmonic current. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In which of the following given faults, all the sequence currents are equal? LLG LL LG LLL LLG LL LG LLL ANSWER DOWNLOAD EXAMIANS APP