Power Systems A gas turbine power plant is best suited for Emergency. None of these. Peak load. Base load. Emergency. None of these. Peak load. Base load. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a short circuit test circuit breaker, time to reach the peak re-striking voltage 60 microsecond & the peak re-striking voltage 120 kV. Determine average RRRV (Rate of rise re-striking voltage)? 3 × 106 kV / sec. 3.5 × 106 kV / sec. 1 × 106 kV / sec. 2 × 106 kV / sec. 3 × 106 kV / sec. 3.5 × 106 kV / sec. 1 × 106 kV / sec. 2 × 106 kV / sec. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The maximum demand of a consumer is 2 kW and corresponding daily energy consumption is 30 units. What is the corresponding load factor? 75% 25% 50.5% 62.5% 75% 25% 50.5% 62.5% ANSWER DOWNLOAD EXAMIANS APP
Power Systems The positive, negative and zero sequence per unit impedance of two generators connected in parallel are X1 = 0.12 pu, X2 = 0.096 pu and X0 = 0.036 pu. For LG fault at generator terminals (with 1 pu voltage) the positive sequence current will be 7.936 pu 9.936 pu 8.936 pu 10.936 pu 7.936 pu 9.936 pu 8.936 pu 10.936 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems Isolator in sub station is open under ------------- condition? any of the above short circuit no load full load any of the above short circuit no load full load ANSWER DOWNLOAD EXAMIANS APP
Power Systems For harnessing low variable water heads, the suitable hydraulic turbine with reaction and adjustable vanes is Kaplan. Pelton. Impeller. Francis. Kaplan. Pelton. Impeller. Francis. ANSWER DOWNLOAD EXAMIANS APP