Power Systems A gas turbine power plant is best suited for Peak load. Emergency. Base load. None of these. Peak load. Emergency. Base load. None of these. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The zero sequence current of a generator for line to ground fault is j3 pu. Then the current through the neutral during the fault is j1 pu j9 pu j6 pu j3 pu j1 pu j9 pu j6 pu j3 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems Inductance of transmission line will decrease when GMD increase and GMR decrease both GMD and GMR decrease GMD decrease and GMR increase both GMD and GMR increase GMD increase and GMR decrease both GMD and GMR decrease GMD decrease and GMR increase both GMD and GMR increase ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a short circuit test circuit breaker, time to reach the peak re-striking voltage 60 microsecond & the peak re-striking voltage 120 kV. Determine average RRRV (Rate of rise re-striking voltage)? 2 × 106 kV / sec. 3 × 106 kV / sec. 1 × 106 kV / sec. 3.5 × 106 kV / sec. 2 × 106 kV / sec. 3 × 106 kV / sec. 1 × 106 kV / sec. 3.5 × 106 kV / sec. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A guard ring is used in string type insulator having 3 units to improve string efficiency. Find the capacitance of metal link 2 if pin to earth capacitance of each unit is 1 F? 0.5 F 2 F 4 F 1 F 0.5 F 2 F 4 F 1 F ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power station has a maximum demand of 15000 kW. The annual load factor is 50% and plant capacity factor is 40%. What is the reserve capacity of the plant? 6000 kW 7500 kW 3750 kW 3000 kW 6000 kW 7500 kW 3750 kW 3000 kW ANSWER DOWNLOAD EXAMIANS APP