Power Systems A gas turbine power plant is best suited for Peak load. Emergency. None of these. Base load. Peak load. Emergency. None of these. Base load. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a long transmission line, if we increase the length of the line, the parameters A and B respectively decreases and decreases increases and increases decreases and increases increases and decreases decreases and decreases increases and increases decreases and increases increases and decreases ANSWER DOWNLOAD EXAMIANS APP
Power Systems The rating of fuse wire is always expressed in ampere-volts. amperes. kWh. ampere-hours. ampere-volts. amperes. kWh. ampere-hours. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 20 MVA generator has inertia constant of 0.5 pu. Find new value for 50 MVA base? 0.2 pu 0.5 pu 0.1 pu 0.4 pu 0.2 pu 0.5 pu 0.1 pu 0.4 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems A CT is connected in ___________________ with the line. series. across. not connected. both A and B. series. across. not connected. both A and B. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is/are the disadvantages of phase modifiers? It consumes both active and reactive power It requires more maintenance because of running equipment All of these Initial cost of synchronous phase modifier is higher It consumes both active and reactive power It requires more maintenance because of running equipment All of these Initial cost of synchronous phase modifier is higher ANSWER DOWNLOAD EXAMIANS APP