Power Systems A gas turbine power plant is best suited for Emergency. Peak load. Base load. None of these. Emergency. Peak load. Base load. None of these. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Load frequency control is achieved by properly matching the individual machines generator ratings. reactive powers. generated voltages. turbine inputs. generator ratings. reactive powers. generated voltages. turbine inputs. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following power plants is free from environmental problem Diesel engine. Steam. Hydroelectric. Nuclear. Diesel engine. Steam. Hydroelectric. Nuclear. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The load current in short circuit calculations are neglected because both 1 and 2 nether 1 nor 2 short circuit currents are greatly out of phase with load currents short circuit currents are much larger than load currents both 1 and 2 nether 1 nor 2 short circuit currents are greatly out of phase with load currents short circuit currents are much larger than load currents ANSWER DOWNLOAD EXAMIANS APP
Power Systems The receiving end voltage for a long line under no load condition is any of the above less than the sending end voltage equal to the sending end voltage more than the sending end voltage any of the above less than the sending end voltage equal to the sending end voltage more than the sending end voltage ANSWER DOWNLOAD EXAMIANS APP
Power Systems The SWR on a lossless transmission line of the characteristic impedance 100 ohm is 3. The line is the terminated by A resistance of j100/3 ohm. A resistance of j300 ohm. A resistance of 100/3 ohm. A resistance of 100 ohm. A resistance of j100/3 ohm. A resistance of j300 ohm. A resistance of 100/3 ohm. A resistance of 100 ohm. ANSWER DOWNLOAD EXAMIANS APP