Power Systems A gas turbine power plant is best suited for None of these. Emergency. Base load. Peak load. None of these. Emergency. Base load. Peak load. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 200 MVA alternator operated at no load at frequency of 50 Hz, it has inertia constant of 5 MWsec/MVA and governing system has a time delay of 0.6 sec. If the load of 50 MW is suddenly applied then find the frequency deviation during this time? 0.76 Hz 0.85 Hz -0.85 Hz -0.76 Hz 0.76 Hz 0.85 Hz -0.85 Hz -0.76 Hz ANSWER DOWNLOAD EXAMIANS APP
Power Systems Objectives of power system is/are nether 1 nor 2 both 1 and 2 Rated voltage and frequency has to be supplied to the consumers Cost of electrical energy per KWh is to be minimum nether 1 nor 2 both 1 and 2 Rated voltage and frequency has to be supplied to the consumers Cost of electrical energy per KWh is to be minimum ANSWER DOWNLOAD EXAMIANS APP
Power Systems When is the ferranti effect on long overhead lines experienced? The power factor is unity The line is heavily loaded The line is lightly loaded The line is fully loaded The power factor is unity The line is heavily loaded The line is lightly loaded The line is fully loaded ANSWER DOWNLOAD EXAMIANS APP
Power Systems Ferranti effect can be compensated by which of the following shunt capacitor shunt reactor both 1 and 2 series capacitor shunt capacitor shunt reactor both 1 and 2 series capacitor ANSWER DOWNLOAD EXAMIANS APP
Power Systems A transmission line has a surge impedance of 400 Ω is connected with the cable having surge impedance of 40 Ω, a surge magnitude of 100 kV is travelling from the transmission line towards the cable. Find the incident current? 250 A 200 A 100 A 2500 A 250 A 200 A 100 A 2500 A ANSWER DOWNLOAD EXAMIANS APP