• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Power Systems

Power Systems
Most commonly used material for insulator is

 glass
All of these
 porcelain
 mica

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which of following power plants normally operage at high speeds

 Hydro electric.
  Thermal.
 Diesel engine.
 Petrol engine.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The essential requirement(s) for power plants to be operated as peak load plants are

All of these
 Quick response to load variation.
 Low capital cost.
 Capability of quick starts.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The voltage regulation of a line at full load 0.8 power factor is 11. A long transmission line under no load conditions, for a good voltage profile needs

 shunt resistance at receiving end
All of these
 shunt reactor at receiving end
 shunt capacitor at receiving end

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
On which one of the following cycles does a modern steam power plant work?

 Otto cycle
 Rankine cycle
 Bell-Coleman cycle
 Carnot cycle

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
An over current relay, having a current setting of 125% connected to a supply circuit through a current transformer of ratio 500/5. The plug setting multiplier for a fault current of 5 kA is

 6
 5
 2
 8

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑