Power Systems Ferranti effect occurs under full load no load any of the above half load full load no load any of the above half load ANSWER DOWNLOAD EXAMIANS APP
Power Systems The draw back of NR method as compare to Gauss-Seidel method is/are? both 1 and 2 large requirement of computer memory large number of iterations None of these both 1 and 2 large requirement of computer memory large number of iterations None of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 50 Hz, 17.32 kV generator is connected to a power system. The system reactance and capacitance per phase are 10 mH and 0.2 mF respectively. What is the maximum voltage across the contacts of the circuit breaker at an instant when it passes through zero? 28.28 kV 29.28 kV 30.28 kV 31.28 kV 28.28 kV 29.28 kV 30.28 kV 31.28 kV ANSWER DOWNLOAD EXAMIANS APP
Power Systems In case of failure of prime mover of the generator, which type of relay is used? reverse power relay impedance relay offset mho relay distance relays reverse power relay impedance relay offset mho relay distance relays ANSWER DOWNLOAD EXAMIANS APP
Power Systems The incremental fuel costs for two generating units G1 and G2 are given by Ic1 = 25 + 0.2 PG1 and Ic2 = 32 + 0.2 PG2, where PG1 and PG2 are real powers generated by the units. The economic allocation for a total load of 250 MW, neglecting transmission loss, is given by PG1 = 109.75 MW and PG2 = 140.25 MW PG1 = 125 MW and PG2 = 125 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 142.5 MW and PG2 = 107.5 MW PG1 = 109.75 MW and PG2 = 140.25 MW PG1 = 125 MW and PG2 = 125 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 142.5 MW and PG2 = 107.5 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems In an induction relay for a particular current setting the operating time 4 sec. When the time multiplier setting is 0.8 if the time multiplier setting is rest to 1 the operating time is 10. 1. 5. un changed. 10. 1. 5. un changed. ANSWER DOWNLOAD EXAMIANS APP