Power Systems Operating time of pumped storage plant is low can't say high very high low can't say high very high ANSWER DOWNLOAD EXAMIANS APP
Power Systems Isolator in sub station is open under ------------- condition? short circuit full load any of the above no load short circuit full load any of the above no load ANSWER DOWNLOAD EXAMIANS APP
Power Systems An over current relay, having a current setting of 125% connected to a supply circuit through a current transformer of ratio 500/5. The plug setting multiplier for a fault current of 5 kA is 6 2 5 8 6 2 5 8 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The skin effect of conductor will increase when frequency decrease All of these diameter decrease resistivity decrease frequency decrease All of these diameter decrease resistivity decrease ANSWER DOWNLOAD EXAMIANS APP
Power Systems The ABCD constants of a 3-phase transmission line are A = D = 0.8∠1°, B = 170∠85° Ω , C = 0.002∠90.4° â„§. The sending end voltage is 400 kV. The receiving end voltage under no load condition is 600 kV 500 kV 400 kV 350 kV 600 kV 500 kV 400 kV 350 kV ANSWER DOWNLOAD EXAMIANS APP
Power Systems When a pumped storage power plant is operated in conjunction with a steam power plant load factor of the steam plant is increased the operating cost of the steam plant become optimum All of these chances of the tripping of the system decrease load factor of the steam plant is increased the operating cost of the steam plant become optimum All of these chances of the tripping of the system decrease ANSWER DOWNLOAD EXAMIANS APP