Power Systems

Power Systems
Operating time of pumped storage plant is

 can't say
 high
 low
 very high

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which of the following is low specific speed turbine?

 Kaplan
None of these
 Pelton
 Francis

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A generating station has a maximum demand of 50 MW a load factor of 60 %, a plant capacity factor of 45 % and if the plant while running as per schedule were fully loaded. The daily energy produced will be

  720 MW.
 730 MW.
 740 MW.
 710 MW.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Merze price current scheme protection is used in

  both A and B.
  alternator.
  transformer.
  bus bars.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
What is the approximate efficiency of a normal thermal power station?

 45-55%
 20-25%
 60-70%
 30-40%

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
An isolated synchronous generator with transient reactance equal to 0.1 pu on a 100 MVA base is connected to the high voltage bus through a step up transformer of reactance 0.1 pu on a 100 MVA base. The fault level at the bus is

 100 MVA
 200 MVA
 500 MVA
 400 MVA

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑