Operating time of pumped storage plant is

 low
 can't say
 high
 very high

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Out of the following plant categories which is not the base load power plant?

  Pump storage.
 Diesel.
 Run of river.
 Nuclear.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The arc voltage produced in an AC circuit breaker is always

  in phase with the arc current.
 leading the arc current by 90°.
 in phase opposition with the arc current.
 lagging the arc current by 90°.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Surge impedance loading of a transmission line can be increased by

 both 1 and 3
 increasing its voltage level
 addition of lumped capacitance in series
 addition of lumped inductance in parallel

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The insulation of the modern EHV lines is designed based on

  the switch voltage.
 corona.
 R × I.
 the lighting voltage.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Where the voltage is high and current to be interrupted is low, Which of following the breaker is preferable?

 Any of these.
 Air blast CB.
 Oil CB.
  Vacuum CB.

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑