Power Systems Operating time of pumped storage plant is high very high can't say low high very high can't say low ANSWER DOWNLOAD EXAMIANS APP
Power Systems The ABCD constants of a 3-phase transmission line are A = D = 0.8∠1°, B = 170∠85° Ω , C = 0.002∠90.4° â„§. The sending end voltage is 400 kV. The receiving end voltage under no load condition is 600 kV 400 kV 500 kV 350 kV 600 kV 400 kV 500 kV 350 kV ANSWER DOWNLOAD EXAMIANS APP
Power Systems Surge impedance loading of a 3-phase, 400 kV transmission line is 400 Ω. The surge impedance loading is 800 MW 200 MW 400 MW 1600 MW 800 MW 200 MW 400 MW 1600 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Surge impedance loading of a transmission line can be increased by addition of lumped capacitance in series addition of lumped inductance in parallel both 1 and 3 increasing its voltage level addition of lumped capacitance in series addition of lumped inductance in parallel both 1 and 3 increasing its voltage level ANSWER DOWNLOAD EXAMIANS APP
Power Systems Maximum efficiency of modern coal fired steam raising thermal power plants is restricted to about 035 (a low value), mainly because of low alternative efficiency. high energy loss from turbine exhaust to condenser. low steam turbine mechanical efficiency. high energy loss in boiler. low alternative efficiency. high energy loss from turbine exhaust to condenser. low steam turbine mechanical efficiency. high energy loss in boiler. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Radio interference occur in telecommunication line due to electro static induction nether 1 nor 2 electro magnetic induction both 1 and 2 electro static induction nether 1 nor 2 electro magnetic induction both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP