Power Systems Operating time of pumped storage plant is can't say high low very high can't say high low very high ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is low specific speed turbine? Kaplan None of these Pelton Francis Kaplan None of these Pelton Francis ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station has a maximum demand of 50 MW a load factor of 60 %, a plant capacity factor of 45 % and if the plant while running as per schedule were fully loaded. The daily energy produced will be 720 MW. 730 MW. 740 MW. 710 MW. 720 MW. 730 MW. 740 MW. 710 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Merze price current scheme protection is used in both A and B. alternator. transformer. bus bars. both A and B. alternator. transformer. bus bars. ANSWER DOWNLOAD EXAMIANS APP
Power Systems What is the approximate efficiency of a normal thermal power station? 45-55% 20-25% 60-70% 30-40% 45-55% 20-25% 60-70% 30-40% ANSWER DOWNLOAD EXAMIANS APP
Power Systems An isolated synchronous generator with transient reactance equal to 0.1 pu on a 100 MVA base is connected to the high voltage bus through a step up transformer of reactance 0.1 pu on a 100 MVA base. The fault level at the bus is 100 MVA 200 MVA 500 MVA 400 MVA 100 MVA 200 MVA 500 MVA 400 MVA ANSWER DOWNLOAD EXAMIANS APP