Power Systems

Power Systems
Operating time of pumped storage plant is

 can't say
 low
 high
 very high

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The load duration curve for a system is 8 hours 30 MW, 16 hours 25 MW and 24 hours 20 MW. The load factor will be

 0.25.
  0.83.
 1.3.
 0.44.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Offset mho relay is used for the protection of equipment when

 failure of prime mover of the generator
None of these
 either 1 or 2
 loss of excitation of the generator

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
In Francis turbine runner, the number blades is usually of the order of

 6 - 8.
  16 - 24.
 3 - 6.
 12 - 14.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The maximum demand of a consumer is 2 kW and corresponding daily energy consumption is 30 units. What is the corresponding load factor?

 75%
 25%
 62.5%
 50.5%

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
In a transmission line the insulators to be used at the dead end or sharp curves are

 pin type insulator
 suspension type
 any of the above
 strain type

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑