Power Systems

Power Systems
Operating time of pumped storage plant is

 low
 can't say
 very high
 high

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A generator has reactances of sub transient (X")= 0.5 pu, transient (X') = 0.8 pu and synchronous reactance (X) = 5 pu. The voltages at these reactances are 1.2 V, 1.1 V and 1 V respectively. Find the corresponding sub transient fault current in pu?

 0.2 pu
 2.4 pu
 3.975 pu
 1.375 pu

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
When series reactor is used in generating stations, the fault current magnitude is

 remains unaffected
 increased
 reduced
 any of the above

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A generator has a rating of 10 MVA, 5 kV has a reactance of 0.02 pu. Find the reactance at a new base values of 50 MVA, 10 kV?

 0.05
 0.02
 0.025
 0.25

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
In a short circuit test circuit breaker, time to reach the peak re-striking voltage 60 microsecond & the peak re-striking voltage 120 kV. Determine average RRRV (Rate of rise re-striking voltage)?

  3 × 106 kV / sec.
  2 × 106 kV / sec.
 1 × 106 kV / sec.
 3.5 × 106 kV / sec.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Out of the following plant categories which is not the base load power plant?

 Diesel.
 Nuclear.
  Pump storage.
 Run of river.

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑