Power Systems Operating time of pumped storage plant is can't say high very high low can't say high very high low ANSWER DOWNLOAD EXAMIANS APP
Power Systems The function of draft tube is reaction turbine is to reduce water hammer. all of above. convert kinetic energy of water. increase flow rate of water. reduce water hammer. all of above. convert kinetic energy of water. increase flow rate of water. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The characteristic impedance of a transmission on line is Directly proportional to square root of its length. Directly proportional to its length. Inversely proportional to its length. Independent of its length. Directly proportional to square root of its length. Directly proportional to its length. Inversely proportional to its length. Independent of its length. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Suspension type insulators are used for voltage beyond 440 V 230 V 33 kV 11 kV 440 V 230 V 33 kV 11 kV ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generator has a rating of 10 MVA, 5 kV has a reactance of 0.02 pu. Find the reactance at a new base values of 50 MVA, 10 kV? 0.25 0.05 0.02 0.025 0.25 0.05 0.02 0.025 ANSWER DOWNLOAD EXAMIANS APP
Power Systems In hydroelectric power plants both operating and initial cost are low. both operating and initial cost are high. operating cost is high and initial cost is low. operating cost is low and initial cost is high. both operating and initial cost are low. both operating and initial cost are high. operating cost is high and initial cost is low. operating cost is low and initial cost is high. ANSWER DOWNLOAD EXAMIANS APP