Operating time of pumped storage plant is

 high
 very high
 can't say
 low

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The ABCD constants of a 3-phase transmission line are A = D = 0.8∠1°, B = 170∠85° Ω , C = 0.002∠90.4° â„§. The sending end voltage is 400 kV. The receiving end voltage under no load condition is

 600 kV
 400 kV
 500 kV
 350 kV

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Surge impedance loading of a 3-phase, 400 kV transmission line is 400 Ω. The surge impedance loading is

 800 MW
 200 MW
 400 MW
 1600 MW

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Surge impedance loading of a transmission line can be increased by

 addition of lumped capacitance in series
 addition of lumped inductance in parallel
 both 1 and 3
 increasing its voltage level

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Maximum efficiency of modern coal fired steam raising thermal power plants is restricted to about 035 (a low value), mainly because of

 low alternative efficiency.
  high energy loss from turbine exhaust to condenser.
 low steam turbine mechanical efficiency.
 high energy loss in boiler.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Radio interference occur in telecommunication line due to

 electro static induction
 nether 1 nor 2
 electro magnetic induction
 both 1 and 2

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑