Power Systems Main bus bar protection scheme is /are both fault bus and differential protection. none of these. fault bus protection. differential protection. both fault bus and differential protection. none of these. fault bus protection. differential protection. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In an induction relay for a particular current setting the operating time 4 sec. When the time multiplier setting is 0.8 if the time multiplier setting is rest to 1 the operating time is un changed. 10. 5. 1. un changed. 10. 5. 1. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The equation of area control error(ACE) is ACE = ΔPtie + b.Δf ACE = ΔPtie +1/ b.Δf ACE = ΔPtie - b.Δf ACE = ΔPtie - 1/b.Δf ACE = ΔPtie + b.Δf ACE = ΔPtie +1/ b.Δf ACE = ΔPtie - b.Δf ACE = ΔPtie - 1/b.Δf ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power station plant load factor is defined as the ratio of minimum load to peak load average load to the peak load minimum load to average load the energy generated to that of maximum energy that could have been generated minimum load to peak load average load to the peak load minimum load to average load the energy generated to that of maximum energy that could have been generated ANSWER DOWNLOAD EXAMIANS APP
Power Systems Specified quantities of slack bus are V and δ P and δ P and Q P and V V and δ P and δ P and Q P and V ANSWER DOWNLOAD EXAMIANS APP
Power Systems The total number of strands in a ACSR conductor are 7, then find the layer number? 5 3 2 7 5 3 2 7 ANSWER DOWNLOAD EXAMIANS APP