Power Systems One fission of U235 releases energy of 200 MeV. 335 MeV. 525 MeV. 435 MeV. 200 MeV. 335 MeV. 525 MeV. 435 MeV. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Surge impedance loading of a line is increased by which of the following compensation methods? shunt capacitor shunt reactor both 1 and 2 series capacitor shunt capacitor shunt reactor both 1 and 2 series capacitor ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is not a secondary nuclear fuel U233. Pu239. None of above. U235. U233. Pu239. None of above. U235. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The zero sequence current of a generator for line to ground fault is j3 pu. Then the current through the neutral during the fault is j3 pu j9 pu j1 pu j6 pu j3 pu j9 pu j1 pu j6 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems The daily energy produced in thermal power station is 720 MWh at a load factor of 0.6. What is the maximum demand of the station? 50 MW 72 MW 30 MW 720 MW 50 MW 72 MW 30 MW 720 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Load frequency control is achieved by properly matching the individual machines turbine inputs. reactive powers. generated voltages. generator ratings. turbine inputs. reactive powers. generated voltages. generator ratings. ANSWER DOWNLOAD EXAMIANS APP