• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

POWER SYSTEMS

Power Systems
The power station that does not requier any moving part is

  Thermonic convertor.
 Solar power generation.
 Tidal power generation.
 Wind power generation.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which of the following will take least time in starting from cold condition to full load operation

 Nuclear power plant.
  Hydro electric power plant.
 Thermal power plant.
 Gas turbine plant.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which power plant cannot have single unit of 100 MW capacity

 Nuclear power plant.
 Steam power plant.
 Hydro electric power plant.
  Diesel engine plant.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The generating station suitable to operate as peak load plant is

 Thermal power station.
 Nuclear power station.
  Pumped storage.
 Power station.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The essential requirement(s) for power plants to be operated as peak load plants are

 Capability of quick starts.
 Low capital cost.
 Quick response to load variation.
All of these

ANSWER DOWNLOAD EXAMIANS APP
  • «
  • 1
  • ...
  • 124
  • 125
  • 126
  • »

GO TO PAGE

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑