Power Systems The generating station suitable to operate as peak load plant is Power station. Thermal power station. Pumped storage. Nuclear power station. Power station. Thermal power station. Pumped storage. Nuclear power station. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The power generated by two plants are; P1 = 50 MW, P2 = 40 MW. If the loss coefficients are B11 = 0.001, B22 = 0.0025 and B12 = -0.0005, then power loss will be 4.5 MW 6.5 MW 8.5 MW 5.5 MW 4.5 MW 6.5 MW 8.5 MW 5.5 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Sum of the elements of row i equal to shunt admittances connected to bus i. If this summation is zero, indicates there is no both 1 and 2 None of these shunt admittance mutual coupling both 1 and 2 None of these shunt admittance mutual coupling ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the time of operation of a relay for unity TMS is 10 sec. the time of operation of 0.5 TMS will be _______________ secs. 5. 3. 7. 20. 5. 3. 7. 20. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Plug setting of a relay can be altered by varying air gap of magnetic path. none of these. no. of ampere-turns. adjustable back up stop. air gap of magnetic path. none of these. no. of ampere-turns. adjustable back up stop. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The only place where slip ring induction motors used in thermal power plants is conveyors. lubrication oil pumps. coal handling plant. none of above. conveyors. lubrication oil pumps. coal handling plant. none of above. ANSWER DOWNLOAD EXAMIANS APP