Power Systems The generating station suitable to operate as peak load plant is Nuclear power station. Power station. Pumped storage. Thermal power station. Nuclear power station. Power station. Pumped storage. Thermal power station. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Critical disruptive voltage is a voltage at which nether 1 nor 2 both 1 and 2 corona is visible with blue or violet colour corona is just initiated nether 1 nor 2 both 1 and 2 corona is visible with blue or violet colour corona is just initiated ANSWER DOWNLOAD EXAMIANS APP
Power Systems The essential requirement(s) for power plants to be operated as peak load plants are Quick response to load variation. Capability of quick starts. Low capital cost. All of these Quick response to load variation. Capability of quick starts. Low capital cost. All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generated station has a maximum demand of 30 MW, a load factor of 60% and a plant capacity factor of 50%. The reserve capacity of the plant is 10 MW 12 MW 5 MW 6 MW 10 MW 12 MW 5 MW 6 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems An over current relay, having a current setting of 125% connected to a supply circuit through a current transformer of ratio 500/5. The plug setting multiplier for a fault current of 5 kA is 2 5 6 8 2 5 6 8 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following buses is/are not PV buses? fixed shunt capacitor buses reactive power support buses voltage control buses both 1 and 2 fixed shunt capacitor buses reactive power support buses voltage control buses both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP