Power Systems The generating station suitable to operate as peak load plant is Pumped storage. Thermal power station. Power station. Nuclear power station. Pumped storage. Thermal power station. Power station. Nuclear power station. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In kaplan runner, the number of blades is generally of the order of 12 - 16. 16 - 24. 3 - 6. 1 - 2. 12 - 16. 16 - 24. 3 - 6. 1 - 2. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Demand factor of a plant is 1 greater than 1 less than 1 0 1 greater than 1 less than 1 0 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The incremental fuel costs for two generating units G1 and G2 are given by Ic1 = 25 + 0.2 PG1 and Ic2 = 32 + 0.2 PG2, where PG1 and PG2 are real powers generated by the units. The economic allocation for a total load of 250 MW, neglecting transmission loss, is given by PG1 = 142.5 MW and PG2 = 107.5 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 125 MW and PG2 = 125 MW PG1 = 109.75 MW and PG2 = 140.25 MW PG1 = 142.5 MW and PG2 = 107.5 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 125 MW and PG2 = 125 MW PG1 = 109.75 MW and PG2 = 140.25 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following are the fissile materials U235 and Th239. None of these. U238 and Th232. U235, U233 and Pu239. U235 and Th239. None of these. U238 and Th232. U235, U233 and Pu239. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Lightning arresters are made up of which material? silver silicon oxide copper any of the above silver silicon oxide copper any of the above ANSWER DOWNLOAD EXAMIANS APP