Power Systems The generating station suitable to operate as peak load plant is Power station. Thermal power station. Nuclear power station. Pumped storage. Power station. Thermal power station. Nuclear power station. Pumped storage. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The annual depreciation of hydro power plant is about 15 - 20 %. 20 - 25 %. 10 - 15 %. 0.5 - 1.5 %. 15 - 20 %. 20 - 25 %. 10 - 15 %. 0.5 - 1.5 %. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Surge impedance loading can be increased by both 1 and 2 increasing of voltage level increasing of inductance value increasing of capacitance value both 1 and 2 increasing of voltage level increasing of inductance value increasing of capacitance value ANSWER DOWNLOAD EXAMIANS APP
Power Systems Binary vapor cycle are used for improving the plant efficiency. improving the condenser performance. increasing the turbine efficiency. All of these improving the plant efficiency. improving the condenser performance. increasing the turbine efficiency. All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems Deaerative heating is done to remove dissolved gases in water. remove dissolved. heat the steam. heat the feed water. remove dissolved gases in water. remove dissolved. heat the steam. heat the feed water. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generator has reactances of sub transient (X")= 0.5 pu, transient (X') = 0.8 pu and synchronous reactance (X) = 5 pu. The voltages at these reactances are 1.2 V, 1.1 V and 1 V respectively. Find the corresponding sub transient fault current in pu? 1.375 pu 2.4 pu 0.2 pu 3.975 pu 1.375 pu 2.4 pu 0.2 pu 3.975 pu ANSWER DOWNLOAD EXAMIANS APP