Power Systems The generating station suitable to operate as peak load plant is Thermal power station. Nuclear power station. Pumped storage. Power station. Thermal power station. Nuclear power station. Pumped storage. Power station. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The rating of fuse wire is always expressed in amperes. kWh. ampere-hours. ampere-volts. amperes. kWh. ampere-hours. ampere-volts. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following statements is/are true? Due to corona, power loss increases charging current increases All of these interference increases power loss increases charging current increases All of these interference increases ANSWER DOWNLOAD EXAMIANS APP
Power Systems Surge impedance loading can be increased by increasing of capacitance value both 1 and 2 increasing of inductance value increasing of voltage level increasing of capacitance value both 1 and 2 increasing of inductance value increasing of voltage level ANSWER DOWNLOAD EXAMIANS APP
Power Systems The SWR on a lossless transmission line of the characteristic impedance 100 ohm is 3. The line is the terminated by A resistance of j300 ohm. A resistance of 100 ohm. A resistance of 100/3 ohm. A resistance of j100/3 ohm. A resistance of j300 ohm. A resistance of 100 ohm. A resistance of 100/3 ohm. A resistance of j100/3 ohm. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For head and low discharge the water turbine used Kaplan wheel. Pelton wheel. Francis turbine. propeller turbine. Kaplan wheel. Pelton wheel. Francis turbine. propeller turbine. ANSWER DOWNLOAD EXAMIANS APP