Power Systems The generating station suitable to operate as peak load plant is Pumped storage. Nuclear power station. Power station. Thermal power station. Pumped storage. Nuclear power station. Power station. Thermal power station. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the conductor diameter decreases, inductance of the line, decreases None of these remains unaffected increases decreases None of these remains unaffected increases ANSWER DOWNLOAD EXAMIANS APP
Power Systems The positive, negative and zero sequence per unit impedance of two generators connected in parallel are X1 = 0.12 pu, X2 = 0.096 pu and X0 = 0.036 pu. For LG fault at generator terminals (with 1 pu voltage) the positive sequence current will be 7.936 pu 9.936 pu 8.936 pu 10.936 pu 7.936 pu 9.936 pu 8.936 pu 10.936 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems For complete protection of 3-phase system from the short circuit faults minimum number of relays required are one six three two one six three two ANSWER DOWNLOAD EXAMIANS APP
Power Systems Differential relays does not used for which of the following faults? both 1 and 2 faults within a transformer through faults faults within a generator both 1 and 2 faults within a transformer through faults faults within a generator ANSWER DOWNLOAD EXAMIANS APP
Power Systems The area under a flow duration curve represents maximum rate of run-off during the period. total quantity of run-off during that period. total power available. total of units of energy available. maximum rate of run-off during the period. total quantity of run-off during that period. total power available. total of units of energy available. ANSWER DOWNLOAD EXAMIANS APP