Power Systems The generating station suitable to operate as peak load plant is Nuclear power station. Thermal power station. Power station. Pumped storage. Nuclear power station. Thermal power station. Power station. Pumped storage. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a pressurized water reactor the coolant water boils in the reactor core. water is used at high pressure so that it is available is liquid from at about 280° C. heavy water is used as both coolant and moderator. both B and C. the coolant water boils in the reactor core. water is used at high pressure so that it is available is liquid from at about 280° C. heavy water is used as both coolant and moderator. both B and C. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A fault occurring at the terminals of an unloaded synchronous generator operating at its rated voltage has resulted in the following values of currents and voltages. IR0 = j 2.37 pu IR1 = -j 3.05 pu IR2 = j 0.68 pu VR0 = VR1 = VR2 = 0.237 pu. Which of the following faults has occurred? LL LG LLL LLG LL LG LLL LLG ANSWER DOWNLOAD EXAMIANS APP
Power Systems Where air circuit breakers are used? Up to 66 kV. Up to 12 kV. Up to 11 kV. Up to 33 kV. Up to 66 kV. Up to 12 kV. Up to 11 kV. Up to 33 kV. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The draw back of NR method as compare to Gauss-Seidel method is/are? large requirement of computer memory large number of iterations both 1 and 2 None of these large requirement of computer memory large number of iterations both 1 and 2 None of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems The ABCD constants of a 3-phase transmission line are A = D = 0.8∠1°, B = 170∠85° Ω , C = 0.002∠90.4° ℧. The sending end voltage is 400 kV. The receiving end voltage under no load condition is 400 kV 600 kV 500 kV 350 kV 400 kV 600 kV 500 kV 350 kV ANSWER DOWNLOAD EXAMIANS APP