Power Systems Stock bridge dampers are used to All of these reduce the vibrations at the point of support increase the sag reduce the tension All of these reduce the vibrations at the point of support increase the sag reduce the tension ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3-phase transmission line operating at Vs = 400 kV and has ABCD parameters A= D = 0.8∠0°, B = 100∠°90 Ω, C = 0.5*10^-6∠90° â„§. Find Charging current under no load? 0.344∠90° A/phase 0.144∠90° A/phase 0.512∠90° A/phase 1.144∠90° A/phase 0.344∠90° A/phase 0.144∠90° A/phase 0.512∠90° A/phase 1.144∠90° A/phase ANSWER DOWNLOAD EXAMIANS APP
Power Systems The zero sequence current of a generator for line to ground fault is j3 pu. Then the current through the neutral during the fault is j9 pu j1 pu j3 pu j6 pu j9 pu j1 pu j3 pu j6 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems In an induction relay for a particular current setting the operating time 4 sec. When the time multiplier setting is 0.8 if the time multiplier setting is rest to 1 the operating time is 5. un changed. 10. 1. 5. un changed. 10. 1. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Highest pressure generating pump inside the thermal plant is low pressure heater high pressure heater boiler feed pump All of these low pressure heater high pressure heater boiler feed pump All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems The corona loss on a particular system at 60 Hz is 1 kW/km per phase. What is the corona loss at 50 Hz in kW/km per phase? 1 1.13 0.882 0.93 1 1.13 0.882 0.93 ANSWER DOWNLOAD EXAMIANS APP