Highway Engineering In highway construction, rolling starts from Sides and proceed to center Any of the above One side and proceed to other side Center and proceed to sides Sides and proceed to center Any of the above One side and proceed to other side Center and proceed to sides ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The drain which is provided parallel to roadway to intercept and divert the water from hill slopes is known as Cross drain Catch-water drain Side drain Sloping drain Cross drain Catch-water drain Side drain Sloping drain ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Centre line markings are used to designate proper lateral placement of vehicles before turning to different directions to designate traffic lanes in roadways meant for two way traffic to indicate that overtaking is not permitted to designate proper lateral placement of vehicles before turning to different directions to designate traffic lanes in roadways meant for two way traffic to indicate that overtaking is not permitted ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum width of a vehicle as recommended by IRC is 4.72 m 3.81 m 1.85 m 2.44 m 4.72 m 3.81 m 1.85 m 2.44 m ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The method of design of flexible pavement as recommended by IRC is Benkelman beam method CBR method group index method Westergaard method Benkelman beam method CBR method group index method Westergaard method ANSWER DOWNLOAD EXAMIANS APP