Highway Engineering In highway construction, rolling starts from Center and proceed to sides One side and proceed to other side Sides and proceed to center Any of the above Center and proceed to sides One side and proceed to other side Sides and proceed to center Any of the above ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The drain which is provided parallel to roadway to intercept and divert the water from hill slopes is known as Catch-water drain Cross drain Sloping drain Side drain Catch-water drain Cross drain Sloping drain Side drain ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Centre line markings are used to designate proper lateral placement of vehicles before turning to different directions to designate traffic lanes in roadways meant for two way traffic to indicate that overtaking is not permitted to designate proper lateral placement of vehicles before turning to different directions to designate traffic lanes in roadways meant for two way traffic to indicate that overtaking is not permitted ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum width of a vehicle as recommended by IRC is 3.81 m 1.85 m 2.44 m 4.72 m 3.81 m 1.85 m 2.44 m 4.72 m ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The method of design of flexible pavement as recommended by IRC is Benkelman beam method Westergaard method CBR method group index method Benkelman beam method Westergaard method CBR method group index method ANSWER DOWNLOAD EXAMIANS APP