Highway Engineering The method of design of flexible pavement as recommended by IRC is group index method Benkelman beam method CBR method Westergaard method group index method Benkelman beam method CBR method Westergaard method ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the group index value of subgrade is between 5 and 9, then the subgrade is treated as poor very poor good fair poor very poor good fair ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is dry rolling, application of screening, application of filler and wet rolling dry rolling, wet rolling, application of screening and application of filler dry rolling, application of screening, wet rolling and application of filler dry rolling, application of filler, wet rolling and application of screening dry rolling, application of screening, application of filler and wet rolling dry rolling, wet rolling, application of screening and application of filler dry rolling, application of screening, wet rolling and application of filler dry rolling, application of filler, wet rolling and application of screening ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering On a horizontal curve if the pavement is kept horizontal across the alignment, then the pressure on the outer wheels will be equal to the pressure on inner wheels less than the pressure on inner wheels more than the pressure on inner wheels zero equal to the pressure on inner wheels less than the pressure on inner wheels more than the pressure on inner wheels zero ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The camber of shoulders in water bound macadam roads is greater than the cross slope of pavement equal to the cross slope of pavement zero less than the cross slope of pavement greater than the cross slope of pavement equal to the cross slope of pavement zero less than the cross slope of pavement ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The ductility value of bitumen for suitability in road construction should not be less than 50cm 10 cm 30 cm 20 cm 50cm 10 cm 30 cm 20 cm ANSWER DOWNLOAD EXAMIANS APP