Highway Engineering If ruling gradient is I in 20 and there is also a horizontal curve of radius 76 m, then the compensated grade should be 4% 5 % 6% 3 % 4% 5 % 6% 3 % ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The desirable length of overtaking zone as per IRC recommendation is equal to three times the overtaking sight distance five times the overtaking sight distance two times the overtaking sight distance overtaking sight distance three times the overtaking sight distance five times the overtaking sight distance two times the overtaking sight distance overtaking sight distance ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For water bound macadam roads in localities of heavy rainfall, the recommended value of camber is 1 in 30 1 in 48 1 in 36 1 in 60 1 in 30 1 in 48 1 in 36 1 in 60 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The direct interchange ramp involves diverging to the left side and merging from right diverging to the right side and merging from right diverging to the left side and merging from left diverging to the right side and merging from left diverging to the left side and merging from right diverging to the right side and merging from right diverging to the left side and merging from left diverging to the right side and merging from left ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum width of a vehicle as recommended by IRC is 3.81 m 1.85 m 2.44 m 4.72 m 3.81 m 1.85 m 2.44 m 4.72 m ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The camber for hill roads in case of bituminous surfacing is adopted as 0.025 0.03 0.04 0.02 0.025 0.03 0.04 0.02 ANSWER DOWNLOAD EXAMIANS APP