Highway Engineering The maximum width of a vehicle as recommended by IRC is 4.72 m 2.44 m 1.85 m 3.81 m 4.72 m 2.44 m 1.85 m 3.81 m ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The ductility value of bitumen for suitability in road construction should not be less than 10 cm 20 cm 30 cm 50cm 10 cm 20 cm 30 cm 50cm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In CBR test the value of CBR is calculated at 5.0 mm penetration only 7.5 mm penetration only 2.5 mm penetration only both 2.5 mm and 5.0 mm penetrations 5.0 mm penetration only 7.5 mm penetration only 2.5 mm penetration only both 2.5 mm and 5.0 mm penetrations ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The fundamental factor in the selection of pavement type is type and intensity of traffic climatic condition subgrade soil and drainage conditions availability of funds for the construction project type and intensity of traffic climatic condition subgrade soil and drainage conditions availability of funds for the construction project ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Stopping sight distance is always equal to overtaking sight distance None of these less than overtaking sight distance more than overtaking sight distance equal to overtaking sight distance None of these less than overtaking sight distance more than overtaking sight distance ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following is known as design capacity ? theoretical capacity possible capacity basic capacity practical capacity theoretical capacity possible capacity basic capacity practical capacity ANSWER DOWNLOAD EXAMIANS APP