Highway Engineering For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is dry rolling, application of screening, wet rolling and application of filler dry rolling, application of filler, wet rolling and application of screening dry rolling, wet rolling, application of screening and application of filler dry rolling, application of screening, application of filler and wet rolling dry rolling, application of screening, wet rolling and application of filler dry rolling, application of filler, wet rolling and application of screening dry rolling, wet rolling, application of screening and application of filler dry rolling, application of screening, application of filler and wet rolling ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The diagram which shows the approximate path of vehicles and pedestrians involved in accidents is known as condition diagram collision diagram pie charts spot maps condition diagram collision diagram pie charts spot maps ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The value of ruling gradient in plains as per IRC recommendation is 1 in 20 1 in 30 1 in 12 1 m 15 1 in 20 1 in 30 1 in 12 1 m 15 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering On a right angled road intersection with two way traffic, the total number of conflict points is 24 11 18 6 24 11 18 6 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following represents a carpet of sand-bitumen mix without coarse aggregates ? bituminous concrete bituminous carpet mastic asphalt sheet asphalt bituminous concrete bituminous carpet mastic asphalt sheet asphalt ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Flexible pavement distribute the wheel load through a set of layers to the subgrade None of these through structural action directly to subgrade through a set of layers to the subgrade None of these through structural action directly to subgrade ANSWER DOWNLOAD EXAMIANS APP