Highway Engineering The ductility value of bitumen for suitability in road construction should not be less than 50cm 20 cm 10 cm 30 cm 50cm 20 cm 10 cm 30 cm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Nagpur road plan formula were prepared by assuming rectangular or block road pattern radial or star and block road pattern radial or star and circular road pattern radial or star and grid road pattern rectangular or block road pattern radial or star and block road pattern radial or star and circular road pattern radial or star and grid road pattern ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The aggregates required for one kilometer length of water bound macadam road per meter width and for 10 mm thickness is 10 cubic meter 12 cubic meter 15 cubic meter 8 cubic meter 10 cubic meter 12 cubic meter 15 cubic meter 8 cubic meter ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Creep is the Lateral movement of rail Vertical movement of rail Difference in level of two rails Longitudinal movement of rail Lateral movement of rail Vertical movement of rail Difference in level of two rails Longitudinal movement of rail ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If ruling gradient is I in 20 and there is also a horizontal curve of radius 76 m, then the compensated grade should be 5 % 6% 4% 3 % 5 % 6% 4% 3 % ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering On a horizontal curve if the pavement is kept horizontal across the alignment, then the pressure on the outer wheels will be zero less than the pressure on inner wheels equal to the pressure on inner wheels more than the pressure on inner wheels zero less than the pressure on inner wheels equal to the pressure on inner wheels more than the pressure on inner wheels ANSWER DOWNLOAD EXAMIANS APP