Highway Engineering The ductility value of bitumen for suitability in road construction should not be less than 30 cm 10 cm 20 cm 50cm 30 cm 10 cm 20 cm 50cm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The desirable length of overtaking zone as per IRC recommendation is equal to three times the overtaking sight distance two times the overtaking sight distance overtaking sight distance five times the overtaking sight distance three times the overtaking sight distance two times the overtaking sight distance overtaking sight distance five times the overtaking sight distance ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering When semaphore and warner are installed on the same post, then the stop indication is given when both semaphore and warner arms lowered both arms are horizontal None of these semaphore arm lowered but warner arm horizontal both semaphore and warner arms lowered both arms are horizontal None of these semaphore arm lowered but warner arm horizontal ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Maximum number of vehicles can be parked with parallel parking 45° angle parking 30° angle parking 90° angle parking parallel parking 45° angle parking 30° angle parking 90° angle parking ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The particular places where pedestrians are to cross the pavement are properly marked by the pavement marking known as stop lines lane lines crosswalk lines turn markings stop lines lane lines crosswalk lines turn markings ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering With increase in speed of the traffic stream, the minimum spacing of vehicles increases first increases and then decreases after reaching a maximum value at optimum speed first decreases and then increases after reaching a minimum value at optimum speed decreases increases first increases and then decreases after reaching a maximum value at optimum speed first decreases and then increases after reaching a minimum value at optimum speed decreases ANSWER DOWNLOAD EXAMIANS APP