Highway Engineering The ductility value of bitumen for suitability in road construction should not be less than 10 cm 50cm 30 cm 20 cm 10 cm 50cm 30 cm 20 cm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For rapid curing cutbacks, the oil used is light diesel heavy diesel gasoline kerosene oil light diesel heavy diesel gasoline kerosene oil ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following is known as design capacity ? theoretical capacity practical capacity possible capacity basic capacity theoretical capacity practical capacity possible capacity basic capacity ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For a 8° curve track diverging from a main curve of 5° in an opposite direction in the layout of a broad gauge yard, the cant to be provided for the branch track for maximum speed of 45 km/h on the main line and ‘G’ = 1.676 m is (Permitted cant deficiency for the main line = 7.6 cm) 0.168 cm 7.768 cm -0.168 cm 7.432 cm 0.168 cm 7.768 cm -0.168 cm 7.432 cm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In CBR test the value of CBR is calculated at 5.0 mm penetration only both 2.5 mm and 5.0 mm penetrations 7.5 mm penetration only 2.5 mm penetration only 5.0 mm penetration only both 2.5 mm and 5.0 mm penetrations 7.5 mm penetration only 2.5 mm penetration only ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The camber of road should be approximately equal to longitudinal gradient half the longitudinal gradient two times the longitudinal gradient three times the longitudinal gradient longitudinal gradient half the longitudinal gradient two times the longitudinal gradient three times the longitudinal gradient ANSWER DOWNLOAD EXAMIANS APP