Highway Engineering The ductility value of bitumen for suitability in road construction should not be less than 50cm 10 cm 30 cm 20 cm 50cm 10 cm 30 cm 20 cm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Compared to a level surface, on a descending gradient the stopping sight distance is dependent on the speed more same less dependent on the speed more same less ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The drain which is provided parallel to roadway to intercept and divert the water from hill slopes is known as Cross drain Catch-water drain Side drain Sloping drain Cross drain Catch-water drain Side drain Sloping drain ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following devices is used to transfer the wagons or locomotives to and from parallel tracks without any necessity of shunting ? turntable scotch block triangle traverser turntable scotch block triangle traverser ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering To calculate the minimum value of ruling radius of horizontal curves in plains, the design speed is given by 8 kmph 12kmph 16kmph 20 kmph 8 kmph 12kmph 16kmph 20 kmph ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is dry rolling, application of screening, application of filler and wet rolling dry rolling, application of screening, wet rolling and application of filler dry rolling, application of filler, wet rolling and application of screening dry rolling, wet rolling, application of screening and application of filler dry rolling, application of screening, application of filler and wet rolling dry rolling, application of screening, wet rolling and application of filler dry rolling, application of filler, wet rolling and application of screening dry rolling, wet rolling, application of screening and application of filler ANSWER DOWNLOAD EXAMIANS APP