Highway Engineering

Highway Engineering
The recommended grade of tar for grouting purpose is

RT-2
RT-3
RT-5
RT-1

ANSWER DOWNLOAD EXAMIANS APP

Highway Engineering
When the path travelled along the road surface is more than the circumferential movement of the wheels due to rotation, then it results in

skidding
turning
revolving
slipping

ANSWER DOWNLOAD EXAMIANS APP

Highway Engineering
In hill roads the side drains arc provided

on both sides of road
None of these
only on the hill side of road
only on the opposite side of hill

ANSWER DOWNLOAD EXAMIANS APP

Highway Engineering
The maximum allowable Los Angeles abrasion value for high quality surface course is

0.3
0.2
0.1
0.45

ANSWER DOWNLOAD EXAMIANS APP

Highway Engineering
In CBR test the value of CBR is calculated at

both 2.5 mm and 5.0 mm penetrations
2.5 mm penetration only
7.5 mm penetration only
5.0 mm penetration only

ANSWER DOWNLOAD EXAMIANS APP

Highway Engineering
For a 8° curve track diverging from a main curve of 5° in an opposite direction in the layout of a broad gauge yard, the cant to be provided for the branch track for maximum speed of 45 km/h on the main line and ‘G’ = 1.676 m is (Permitted cant deficiency for the main line = 7.6 cm)

7.432 cm
0.168 cm
7.768 cm
-0.168 cm

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Highway Engineering

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑