Highway Engineering Nagpur road plan formula were prepared by assuming radial or star and grid road pattern rectangular or block road pattern radial or star and circular road pattern radial or star and block road pattern radial or star and grid road pattern rectangular or block road pattern radial or star and circular road pattern radial or star and block road pattern ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In CBR test the value of CBR is calculated at 7.5 mm penetration only 5.0 mm penetration only both 2.5 mm and 5.0 mm penetrations 2.5 mm penetration only 7.5 mm penetration only 5.0 mm penetration only both 2.5 mm and 5.0 mm penetrations 2.5 mm penetration only ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The method of design of flexible pavement as recommended by IRC is group index method CBR method Westergaard method Benkelman beam method group index method CBR method Westergaard method Benkelman beam method ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following is indicated by a warning sign ? level crossing end of speed limit no parking overtaking prohibited level crossing end of speed limit no parking overtaking prohibited ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For rapid curing cutbacks, the oil used is heavy diesel light diesel gasoline kerosene oil heavy diesel light diesel gasoline kerosene oil ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering As per IRC recommendations, the maximum limit of super elevation for mixed traffic in plain terrain is 1 in 15 equal to camber 1 in 12.5 1 in 10 1 in 15 equal to camber 1 in 12.5 1 in 10 ANSWER DOWNLOAD EXAMIANS APP