Highway Engineering Reaction time of a driver is same for all speeds increases with increase in speed decreases with increase in speed None of these is same for all speeds increases with increase in speed decreases with increase in speed None of these ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Rigidity factor for a tyre pressure greater than 7 kg/cm² is equal to 1 greater than 1 less than 1 zero equal to 1 greater than 1 less than 1 zero ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the stopping distance and average length of a vehicle are 18 m and 6 m respectively, then the theoretical maxi¬mum capacity of a traffic lane at a speed of 10 m/sec is 1500 vehicles per hour 2500 vehicles per hour 2000 vehicles per hour 3000 vehicles per hour 1500 vehicles per hour 2500 vehicles per hour 2000 vehicles per hour 3000 vehicles per hour ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The thickness of bituminous carpet varies from 100 to 120 mm 20 to 25 mm 50 to 75 mm 75 to 100 mm 100 to 120 mm 20 to 25 mm 50 to 75 mm 75 to 100 mm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The camber of road should be approximately equal to two times the longitudinal gradient longitudinal gradient half the longitudinal gradient three times the longitudinal gradient two times the longitudinal gradient longitudinal gradient half the longitudinal gradient three times the longitudinal gradient ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The provision of traffic signals at intersections reduces right angled collisions but may increase rear end collisions reduces right angled and rear end collisions increases right angled and rear end collisions reduces rear end collisions but may increase right angled collisions reduces right angled collisions but may increase rear end collisions reduces right angled and rear end collisions increases right angled and rear end collisions reduces rear end collisions but may increase right angled collisions ANSWER DOWNLOAD EXAMIANS APP