Highway Engineering If the design speed is V kmph and deviation angle is N radians, then the total length of a valley curve in meters is given by the expression 0.38 (NV3)”2 0.38 N V3/2 3.8 NV”2 3.8 (NV3)”2 0.38 (NV3)”2 0.38 N V3/2 3.8 NV”2 3.8 (NV3)”2 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The recommended grade of tar for grouting purpose is RT-5 RT-2 RT-3 RT-1 RT-5 RT-2 RT-3 RT-1 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Flexible pavement distribute the wheel load through a set of layers to the subgrade None of these through structural action directly to subgrade through a set of layers to the subgrade None of these through structural action directly to subgrade ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Desire lines are plotted in accident studies traffic volume studies origin and destination studies speed studies accident studies traffic volume studies origin and destination studies speed studies ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the average center to center spacing of vehicles is 20 meters, then the basic capacity of a traffic lane at a speed of 50 kmph is 2000 vehicles per hour 2500 vehicles per day 1000 vehicles per hour 2500 vehicles per hour 2000 vehicles per hour 2500 vehicles per day 1000 vehicles per hour 2500 vehicles per hour ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Bottom most layer of pavement is known as sub-base course base course subgrade wearing course sub-base course base course subgrade wearing course ANSWER DOWNLOAD EXAMIANS APP