Highway Engineering If the design speed is V kmph and deviation angle is N radians, then the total length of a valley curve in meters is given by the expression 3.8 NV”2 3.8 (NV3)”2 0.38 N V3/2 0.38 (NV3)”2 3.8 NV”2 3.8 (NV3)”2 0.38 N V3/2 0.38 (NV3)”2 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Select the correct statement. More the value of group index, less thickness of pavement will be required All of these Minimum and maximum values of group index can be 0 and 20 respectively More the value of CBR, greater thickness of pavement will be required More the value of group index, less thickness of pavement will be required All of these Minimum and maximum values of group index can be 0 and 20 respectively More the value of CBR, greater thickness of pavement will be required ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The ductility value of bitumen for suitability in road construction should not be less than 10 cm 50cm 20 cm 30 cm 10 cm 50cm 20 cm 30 cm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Maximum daily traffic capacity of bituminous pavements is 1500 tonnes per day 2000 tonnes per day 500 tonnes per day 1000 tonnes per day 1500 tonnes per day 2000 tonnes per day 500 tonnes per day 1000 tonnes per day ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The fundamental factor in the selection of pavement type is subgrade soil and drainage conditions climatic condition type and intensity of traffic availability of funds for the construction project subgrade soil and drainage conditions climatic condition type and intensity of traffic availability of funds for the construction project ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If aggregate impact value is 20 to 30 percent, then it is classified as satisfactory for road surfacing strong exceptionally strong unsuitable for road surfacing satisfactory for road surfacing strong exceptionally strong unsuitable for road surfacing ANSWER DOWNLOAD EXAMIANS APP