Highway Engineering The attainment of super elevation by rotation of pavement about the inner edge of the pavement does not change the vertical alignment of road results in balancing the earthwork avoids the drainage problem in flat terrain is preferable in steep terrain does not change the vertical alignment of road results in balancing the earthwork avoids the drainage problem in flat terrain is preferable in steep terrain ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For water bound macadam roads in localities of heavy rainfall, the recommended value of camber is 1 in 48 1 in 36 1 in 30 1 in 60 1 in 48 1 in 36 1 in 30 1 in 60 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Bitumen of grade 80/100 means its penetration value is 8 mm its penetration value is 8 to 10 cm its penetration value is 10 mm its penetration value is 8 to 10 mm its penetration value is 8 mm its penetration value is 8 to 10 cm its penetration value is 10 mm its penetration value is 8 to 10 mm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering On a right angled road intersection with two way traffic, the total number of conflict points is 18 11 6 24 18 11 6 24 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering As per IRC recommendations, the average level of illumination on important roads carrying fast traffic is 20 lux 15 lux 30 lux 10 lux 20 lux 15 lux 30 lux 10 lux ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum allowable Los Angeles abrasion value for high quality surface course is 0.3 0.2 0.1 0.45 0.3 0.2 0.1 0.45 ANSWER DOWNLOAD EXAMIANS APP