Highway Engineering Centre line markings are used to indicate that overtaking is not permitted to designate traffic lanes in roadways meant for two way traffic to designate proper lateral placement of vehicles before turning to different directions to indicate that overtaking is not permitted to designate traffic lanes in roadways meant for two way traffic to designate proper lateral placement of vehicles before turning to different directions ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Rigidity factor for a tyre pressure greater than 7 kg/cm² is zero equal to 1 greater than 1 less than 1 zero equal to 1 greater than 1 less than 1 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering When the width of car parking space and width of street are limited, generally preferred parking system is 90° angle parking 65° angle parking 45° angle parking Parallel parking 90° angle parking 65° angle parking 45° angle parking Parallel parking ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The critical combination of stresses for corner region in cement concrete roads is Load stress + frictional stress Load stress + warping stress + frictional stress Load stress + warping stress frictional stress Load stress + warping stress Load stress + frictional stress Load stress + warping stress + frictional stress Load stress + warping stress frictional stress Load stress + warping stress ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following turnouts is most commonly used for goods train on Indian Railways ? 1 in 20 1 in 12 1 in 8’/2 1 in 16 1 in 20 1 in 12 1 in 8’/2 1 in 16 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the average center to center spacing of vehicles is 20 meters, then the basic capacity of a traffic lane at a speed of 50 kmph is 2000 vehicles per hour 2500 vehicles per hour 2500 vehicles per day 1000 vehicles per hour 2000 vehicles per hour 2500 vehicles per hour 2500 vehicles per day 1000 vehicles per hour ANSWER DOWNLOAD EXAMIANS APP