Highway Engineering The camber for hill roads in case of bituminous surfacing is adopted as 0.025 0.02 0.03 0.04 0.025 0.02 0.03 0.04 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the stopping distance and average length of a vehicle are 18 m and 6 m respectively, then the theoretical maxi¬mum capacity of a traffic lane at a speed of 10 m/sec is 1500 vehicles per hour 2500 vehicles per hour 2000 vehicles per hour 3000 vehicles per hour 1500 vehicles per hour 2500 vehicles per hour 2000 vehicles per hour 3000 vehicles per hour ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In highway construction, rolling starts from Sides and proceed to center One side and proceed to other side Any of the above Center and proceed to sides Sides and proceed to center One side and proceed to other side Any of the above Center and proceed to sides ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum spacing of contraction joints in rigid pavements is 3.5 m 5.5m 4.5 m 2.5 m 3.5 m 5.5m 4.5 m 2.5 m ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering When semaphore and warner are installed on the same post, then the stop indication is given when both arms are horizontal None of these both semaphore and warner arms lowered semaphore arm lowered but warner arm horizontal both arms are horizontal None of these both semaphore and warner arms lowered semaphore arm lowered but warner arm horizontal ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The direct interchange ramp involves diverging to the left side and merging from left diverging to the right side and merging from left diverging to the left side and merging from right diverging to the right side and merging from right diverging to the left side and merging from left diverging to the right side and merging from left diverging to the left side and merging from right diverging to the right side and merging from right ANSWER DOWNLOAD EXAMIANS APP