Highway Engineering The camber for hill roads in case of bituminous surfacing is adopted as 0.025 0.02 0.04 0.03 0.025 0.02 0.04 0.03 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Select the correct statement. Minimum and maximum values of group index can be 0 and 20 respectively More the value of group index, less thickness of pavement will be required All of these More the value of CBR, greater thickness of pavement will be required Minimum and maximum values of group index can be 0 and 20 respectively More the value of group index, less thickness of pavement will be required All of these More the value of CBR, greater thickness of pavement will be required ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering With increase in speed of the traffic stream, the maximum capacity of the lane decreases increases first decreases and then increases after reaching a minimum value at optimum speed first increases and then decreases after reaching a maximum value at optimum speed decreases increases first decreases and then increases after reaching a minimum value at optimum speed first increases and then decreases after reaching a maximum value at optimum speed ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Softening point of bitumen to be used for read construction at a place where maximum temperature is 40° C should be less-than 40°C None of these equal to 40°C greater than 40°C less-than 40°C None of these equal to 40°C greater than 40°C ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The rail is designated by its cross-section weight weight per unit length length cross-section weight weight per unit length length ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The particular places where pedestrians are to cross the pavement are properly marked by the pavement marking known as stop lines lane lines turn markings crosswalk lines stop lines lane lines turn markings crosswalk lines ANSWER DOWNLOAD EXAMIANS APP