Highway Engineering The camber for hill roads in case of bituminous surfacing is adopted as 0.02 0.03 0.04 0.025 0.02 0.03 0.04 0.025 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The walls which are necessary on the hill side of roadway where earth has to be retained from slipping is known as None of these breast wall retaining wall parapet wall None of these breast wall retaining wall parapet wall ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following shapes is preferred in a valley curve ? cubic parabola spiral lemniscate simple parabola cubic parabola spiral lemniscate simple parabola ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering “Dead Slow” is a regulatory sign None of these informatory sign warning sign regulatory sign None of these informatory sign warning sign ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The sequence of four stages of survey in a highway alignment is preliminary survey, map study, reconnaissance and detailed survey map study, preliminary survey, reconnaissance and detailed survey reconnaissance, map study, preliminary survey and detailed survey map study, reconnaissance, preliminary survey and detailed survey preliminary survey, map study, reconnaissance and detailed survey map study, preliminary survey, reconnaissance and detailed survey reconnaissance, map study, preliminary survey and detailed survey map study, reconnaissance, preliminary survey and detailed survey ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Select the correct statement. More the value of CBR, greater thickness of pavement will be required More the value of group index, less thickness of pavement will be required Minimum and maximum values of group index can be 0 and 20 respectively All of these More the value of CBR, greater thickness of pavement will be required More the value of group index, less thickness of pavement will be required Minimum and maximum values of group index can be 0 and 20 respectively All of these ANSWER DOWNLOAD EXAMIANS APP