Highway Engineering The camber for hill roads in case of bituminous surfacing is adopted as 0.04 0.02 0.025 0.03 0.04 0.02 0.025 0.03 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For design, that length of transition curve should be taken which is higher of (A) and (B) based on rate of change of super elevation smaller of (A) and (B) based on allowable rate of change of centrifugal acceleration higher of (A) and (B) based on rate of change of super elevation smaller of (A) and (B) based on allowable rate of change of centrifugal acceleration ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the group index value of subgrade is between 5 and 9, then the subgrade is treated as very poor poor good fair very poor poor good fair ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For a constant value of coefficient of lateral friction, the value of required super-elevation increases with decrease in speed and with increase in radius of curve increase in speed and with decrease in radius of curve decrease in both speed and radius of curve increase in both speed and radius of curve decrease in speed and with increase in radius of curve increase in speed and with decrease in radius of curve decrease in both speed and radius of curve increase in both speed and radius of curve ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The critical combination of stresses for corner region in cement concrete roads is Load stress + warping stress frictional stress Load stress + frictional stress Load stress + warping stress Load stress + warping stress + frictional stress Load stress + warping stress frictional stress Load stress + frictional stress Load stress + warping stress Load stress + warping stress + frictional stress ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In the penetration macadam construction, the bitumen is Premixed with aggregates and then spread Sprayed after the aggregates are spread and compacted Sprayed before the aggregates are spread and compacted None of these Premixed with aggregates and then spread Sprayed after the aggregates are spread and compacted Sprayed before the aggregates are spread and compacted None of these ANSWER DOWNLOAD EXAMIANS APP