Highway Engineering The camber for hill roads in case of bituminous surfacing is adopted as 0.03 0.02 0.025 0.04 0.03 0.02 0.025 0.04 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In highway construction, rolling starts from Sides and proceed to center Center and proceed to sides One side and proceed to other side Any of the above Sides and proceed to center Center and proceed to sides One side and proceed to other side Any of the above ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering With increase in speed of the traffic stream, the minimum spacing of vehicles increases first decreases and then increases after reaching a minimum value at optimum speed first increases and then decreases after reaching a maximum value at optimum speed decreases increases first decreases and then increases after reaching a minimum value at optimum speed first increases and then decreases after reaching a maximum value at optimum speed decreases ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following represents a carpet of sand-bitumen mix without coarse aggregates ? bituminous concrete bituminous carpet mastic asphalt sheet asphalt bituminous concrete bituminous carpet mastic asphalt sheet asphalt ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For a 8° curve track diverging from a main curve of 5° in an opposite direction in the layout of a broad gauge yard, the cant to be provided for the branch track for maximum speed of 45 km/h on the main line and ‘G’ = 1.676 m is (Permitted cant deficiency for the main line = 7.6 cm) 7.768 cm 0.168 cm -0.168 cm 7.432 cm 7.768 cm 0.168 cm -0.168 cm 7.432 cm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If aggregate impact value is 20 to 30 percent, then it is classified as satisfactory for road surfacing strong exceptionally strong unsuitable for road surfacing satisfactory for road surfacing strong exceptionally strong unsuitable for road surfacing ANSWER DOWNLOAD EXAMIANS APP