Highway Engineering The camber for hill roads in case of bituminous surfacing is adopted as 0.03 0.025 0.02 0.04 0.03 0.025 0.02 0.04 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is dry rolling, application of screening, application of filler and wet rolling dry rolling, wet rolling, application of screening and application of filler dry rolling, application of filler, wet rolling and application of screening dry rolling, application of screening, wet rolling and application of filler dry rolling, application of screening, application of filler and wet rolling dry rolling, wet rolling, application of screening and application of filler dry rolling, application of filler, wet rolling and application of screening dry rolling, application of screening, wet rolling and application of filler ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If aggregate impact value is 20 to 30 percent, then it is classified as strong unsuitable for road surfacing exceptionally strong satisfactory for road surfacing strong unsuitable for road surfacing exceptionally strong satisfactory for road surfacing ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The critical combination of stresses for corner region in cement concrete roads is Load stress + frictional stress Load stress + warping stress + frictional stress Load stress + warping stress Load stress + warping stress frictional stress Load stress + frictional stress Load stress + warping stress + frictional stress Load stress + warping stress Load stress + warping stress frictional stress ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum number of vehicles beyond which the rotary may not function efficiently is 500 vehicles per day 5000 vehicles per hour 5000 vehicles per day 500 vehicles per hour 500 vehicles per day 5000 vehicles per hour 5000 vehicles per day 500 vehicles per hour ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Nagpur road plan formula were prepared by assuming rectangular or block road pattern radial or star and grid road pattern radial or star and block road pattern radial or star and circular road pattern rectangular or block road pattern radial or star and grid road pattern radial or star and block road pattern radial or star and circular road pattern ANSWER DOWNLOAD EXAMIANS APP