Highway Engineering The camber for hill roads in case of bituminous surfacing is adopted as 0.02 0.04 0.03 0.025 0.02 0.04 0.03 0.025 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In highway construction, rolling starts from One side and proceed to other side Sides and proceed to center Any of the above Center and proceed to sides One side and proceed to other side Sides and proceed to center Any of the above Center and proceed to sides ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Penetration test on bitumen is used for determining its Ductility Viscosity Temperature susceptibility Grade Ductility Viscosity Temperature susceptibility Grade ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the design speed is V kmph and deviation angle is N radians, then the total length of a valley curve in meters is given by the expression 3.8 NV”2 0.38 (NV3)”2 0.38 N V3/2 3.8 (NV3)”2 3.8 NV”2 0.38 (NV3)”2 0.38 N V3/2 3.8 (NV3)”2 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If ruling gradient is I in 20 and there is also a horizontal curve of radius 76 m, then the compensated grade should be 5 % 6% 3 % 4% 5 % 6% 3 % 4% ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In hill roads the side drains arc provided only on the opposite side of hill only on the hill side of road on both sides of road None of these only on the opposite side of hill only on the hill side of road on both sides of road None of these ANSWER DOWNLOAD EXAMIANS APP