Highway Engineering The camber for hill roads in case of bituminous surfacing is adopted as 0.025 0.02 0.04 0.03 0.025 0.02 0.04 0.03 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum spacing of contraction joints in rigid pavements is 2.5 m 5.5m 4.5 m 3.5 m 2.5 m 5.5m 4.5 m 3.5 m ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Desire lines are plotted in accident studies origin and destination studies traffic volume studies speed studies accident studies origin and destination studies traffic volume studies speed studies ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering “Dead Slow” is a warning sign regulatory sign informatory sign None of these warning sign regulatory sign informatory sign None of these ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering With increase in speed of the traffic stream, the maximum capacity of the lane decreases increases first increases and then decreases after reaching a maximum value at optimum speed first decreases and then increases after reaching a minimum value at optimum speed decreases increases first increases and then decreases after reaching a maximum value at optimum speed first decreases and then increases after reaching a minimum value at optimum speed ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In hill roads the side drains arc provided only on the opposite side of hill None of these only on the hill side of road on both sides of road only on the opposite side of hill None of these only on the hill side of road on both sides of road ANSWER DOWNLOAD EXAMIANS APP