Highway Engineering The camber for hill roads in case of bituminous surfacing is adopted as 0.02 0.025 0.03 0.04 0.02 0.025 0.03 0.04 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum limit of water absorption for aggregate suitable for road construction is 0.8 % 1.0 % 0.6 % 0.4 % 0.8 % 1.0 % 0.6 % 0.4 % ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The background colour of the informatory sign board is red yellow white green red yellow white green ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For water bound macadam roads in localities of heavy rainfall, the recommended value of camber is 1 in 36 1 in 60 1 in 48 1 in 30 1 in 36 1 in 60 1 in 48 1 in 30 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering When semaphore and warner are installed on the same post, then the stop indication is given when both arms are horizontal None of these semaphore arm lowered but warner arm horizontal both semaphore and warner arms lowered both arms are horizontal None of these semaphore arm lowered but warner arm horizontal both semaphore and warner arms lowered ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the design speed is V kmph and deviation angle is N radians, then the total length of a valley curve in meters is given by the expression 3.8 (NV3)”2 0.38 N V3/2 0.38 (NV3)”2 3.8 NV”2 3.8 (NV3)”2 0.38 N V3/2 0.38 (NV3)”2 3.8 NV”2 ANSWER DOWNLOAD EXAMIANS APP