Highway Engineering
In case of hill roads, the extra widening is generally provided

equally on inner and outer sides of the curve
fully on the outer side of the curve
fully on the inner side of the curve
one-fourth on inner side and three-fourth on outer side of the curve

ANSWER DOWNLOAD EXAMIANS APP

Highway Engineering
The sequence of four stages of survey in a highway alignment is

map study, reconnaissance, preliminary survey and detailed survey
preliminary survey, map study, reconnaissance and detailed survey
reconnaissance, map study, preliminary survey and detailed survey
map study, preliminary survey, reconnaissance and detailed survey

ANSWER DOWNLOAD EXAMIANS APP

Highway Engineering
If b is the wheel track of a vehicle and h is the height of centre of gravity above road surface, then to avoid overturning and lateral skidding on a horizontal curve, the centrifugal ratio should always be

less than b/2h and also less than co-efficient of lateral friction
greater than b/2h and less than co-efficient of lateral friction
greater than b/2h and also greater than coefficient of lateral friction
less than b/2h and greater than co-efficient of lateral friction

ANSWER DOWNLOAD EXAMIANS APP