Highway Engineering Which of the following devices is used to transfer the wagons or locomotives to and from parallel tracks without any necessity of shunting ? turntable scotch block triangle traverser turntable scotch block triangle traverser ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is dry rolling, application of filler, wet rolling and application of screening dry rolling, application of screening, application of filler and wet rolling dry rolling, application of screening, wet rolling and application of filler dry rolling, wet rolling, application of screening and application of filler dry rolling, application of filler, wet rolling and application of screening dry rolling, application of screening, application of filler and wet rolling dry rolling, application of screening, wet rolling and application of filler dry rolling, wet rolling, application of screening and application of filler ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The attainment of super elevation by rotation of pavement about the inner edge of the pavement results in balancing the earthwork is preferable in steep terrain avoids the drainage problem in flat terrain does not change the vertical alignment of road results in balancing the earthwork is preferable in steep terrain avoids the drainage problem in flat terrain does not change the vertical alignment of road ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering As per IRC recommendations, the maximum limit of super elevation for mixed traffic in plain terrain is 1 in 10 equal to camber 1 in 15 1 in 12.5 1 in 10 equal to camber 1 in 15 1 in 12.5 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If an ascending gradient of 1 in 50 meets a descending gradient of 1 in 50, the length of summit curve for a stopping sight distance of 80 m will be 60m 80m 64m zero 60m 80m 64m zero ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Maximum daily traffic capacity of bituminous pavements is 2000 tonnes per day 1500 tonnes per day 1000 tonnes per day 500 tonnes per day 2000 tonnes per day 1500 tonnes per day 1000 tonnes per day 500 tonnes per day ANSWER DOWNLOAD EXAMIANS APP