Highway Engineering As per IRC recommendations, the maximum limit of super elevation for mixed traffic in plain terrain is 1 in 10 equal to camber 1 in 15 1 in 12.5 1 in 10 equal to camber 1 in 15 1 in 12.5 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The sequence of four stages of survey in a highway alignment is map study, preliminary survey, reconnaissance and detailed survey preliminary survey, map study, reconnaissance and detailed survey reconnaissance, map study, preliminary survey and detailed survey map study, reconnaissance, preliminary survey and detailed survey map study, preliminary survey, reconnaissance and detailed survey preliminary survey, map study, reconnaissance and detailed survey reconnaissance, map study, preliminary survey and detailed survey map study, reconnaissance, preliminary survey and detailed survey ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Penetration test on bitumen is used for determining its Ductility Grade Temperature susceptibility Viscosity Ductility Grade Temperature susceptibility Viscosity ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following devices is used to transfer the wagons or locomotives to and from parallel tracks without any necessity of shunting ? traverser scotch block triangle turntable traverser scotch block triangle turntable ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following methods is preferred for collecting origin and destination data for a small area like a mass business center or a large intersection ? home interview method return postcard method road side interview method license plate method home interview method return postcard method road side interview method license plate method ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Desire lines are plotted in origin and destination studies accident studies speed studies traffic volume studies origin and destination studies accident studies speed studies traffic volume studies ANSWER DOWNLOAD EXAMIANS APP