Highway Engineering As per IRC recommendations, the maximum limit of super elevation for mixed traffic in plain terrain is 1 in 12.5 1 in 10 1 in 15 equal to camber 1 in 12.5 1 in 10 1 in 15 equal to camber ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following methods is preferred for collecting origin and destination data for a small area like a mass business center or a large intersection ? home interview method license plate method road side interview method return postcard method home interview method license plate method road side interview method return postcard method ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering “Dead Slow” is a None of these informatory sign warning sign regulatory sign None of these informatory sign warning sign regulatory sign ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In highway construction on super elevated curves, the rolling shall proceed from upper edge towards the lower edge lower edge towards the upper edge centre towards the sides sides towards the centre upper edge towards the lower edge lower edge towards the upper edge centre towards the sides sides towards the centre ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The camber of road should be approximately equal to longitudinal gradient half the longitudinal gradient two times the longitudinal gradient three times the longitudinal gradient longitudinal gradient half the longitudinal gradient two times the longitudinal gradient three times the longitudinal gradient ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering With increase in speed of the traffic stream, the minimum spacing of vehicles increases decreases first decreases and then increases after reaching a minimum value at optimum speed first increases and then decreases after reaching a maximum value at optimum speed increases decreases first decreases and then increases after reaching a minimum value at optimum speed first increases and then decreases after reaching a maximum value at optimum speed ANSWER DOWNLOAD EXAMIANS APP