Highway Engineering Number of cotters used in CST-9 sleepers is 5 3 2 4 5 3 2 4 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Softening point of bitumen to be used for read construction at a place where maximum temperature is 40° C should be None of these greater than 40°C equal to 40°C less-than 40°C None of these greater than 40°C equal to 40°C less-than 40°C ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The sequence of four stages of survey in a highway alignment is map study, preliminary survey, reconnaissance and detailed survey preliminary survey, map study, reconnaissance and detailed survey reconnaissance, map study, preliminary survey and detailed survey map study, reconnaissance, preliminary survey and detailed survey map study, preliminary survey, reconnaissance and detailed survey preliminary survey, map study, reconnaissance and detailed survey reconnaissance, map study, preliminary survey and detailed survey map study, reconnaissance, preliminary survey and detailed survey ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For rapid curing cutbacks, the oil used is heavy diesel light diesel gasoline kerosene oil heavy diesel light diesel gasoline kerosene oil ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum limit of water absorption for aggregate suitable for road construction is 0.4 % 0.6 % 1.0 % 0.8 % 0.4 % 0.6 % 1.0 % 0.8 % ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The direct interchange ramp involves diverging to the left side and merging from right diverging to the right side and merging from left diverging to the left side and merging from left diverging to the right side and merging from right diverging to the left side and merging from right diverging to the right side and merging from left diverging to the left side and merging from left diverging to the right side and merging from right ANSWER DOWNLOAD EXAMIANS APP