Highway Engineering If the group index value of subgrade is between 5 and 9, then the subgrade is treated as good very poor poor fair good very poor poor fair ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is dry rolling, application of screening, wet rolling and application of filler dry rolling, application of screening, application of filler and wet rolling dry rolling, application of filler, wet rolling and application of screening dry rolling, wet rolling, application of screening and application of filler dry rolling, application of screening, wet rolling and application of filler dry rolling, application of screening, application of filler and wet rolling dry rolling, application of filler, wet rolling and application of screening dry rolling, wet rolling, application of screening and application of filler ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In highway construction on super elevated curves, the rolling shall proceed from upper edge towards the lower edge sides towards the centre lower edge towards the upper edge centre towards the sides upper edge towards the lower edge sides towards the centre lower edge towards the upper edge centre towards the sides ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The number of repetitions, which the pavement thickness designed for a given wheel load should be able to support during the life of pavement is 1000000 100000 10000 1000 1000000 100000 10000 1000 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering “Dead Slow” is a informatory sign regulatory sign warning sign None of these informatory sign regulatory sign warning sign None of these ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For the design of super elevation for mixed traffic conditions, the speed is reduced by 15% 75% 20% 25% 15% 75% 20% 25% ANSWER DOWNLOAD EXAMIANS APP