Highway Engineering In hill roads the side drains arc provided on both sides of road only on the opposite side of hill only on the hill side of road None of these on both sides of road only on the opposite side of hill only on the hill side of road None of these ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering RC-2, MC-2 and SC-2 correspond to same viscosity viscosity in increasing order from RC-2 to SC-2 viscosity in decreasing order from RC-2 to SC-2 None of these same viscosity viscosity in increasing order from RC-2 to SC-2 viscosity in decreasing order from RC-2 to SC-2 None of these ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following represents a carpet of sand-bitumen mix without coarse aggregates ? bituminous concrete mastic asphalt sheet asphalt bituminous carpet bituminous concrete mastic asphalt sheet asphalt bituminous carpet ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For water bound macadam roads in localities of heavy rainfall, the recommended value of camber is 1 in 36 1 in 60 1 in 48 1 in 30 1 in 36 1 in 60 1 in 48 1 in 30 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For design, that length of transition curve should be taken which is based on rate of change of super elevation based on allowable rate of change of centrifugal acceleration smaller of (A) and (B) higher of (A) and (B) based on rate of change of super elevation based on allowable rate of change of centrifugal acceleration smaller of (A) and (B) higher of (A) and (B) ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The camber for hill roads in case of bituminous surfacing is adopted as 0.02 0.025 0.03 0.04 0.02 0.025 0.03 0.04 ANSWER DOWNLOAD EXAMIANS APP