Highway Engineering In hill roads the side drains arc provided only on the hill side of road only on the opposite side of hill on both sides of road None of these only on the hill side of road only on the opposite side of hill on both sides of road None of these ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering When the path travelled along the road surface is more than the circumferential movement of the wheels due to rotation, then it results in skidding slipping turning revolving skidding slipping turning revolving ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The diagram which shows the approximate path of vehicles and pedestrians involved in accidents is known as collision diagram condition diagram spot maps pie charts collision diagram condition diagram spot maps pie charts ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The sequence of four stages of survey in a highway alignment is reconnaissance, map study, preliminary survey and detailed survey map study, preliminary survey, reconnaissance and detailed survey preliminary survey, map study, reconnaissance and detailed survey map study, reconnaissance, preliminary survey and detailed survey reconnaissance, map study, preliminary survey and detailed survey map study, preliminary survey, reconnaissance and detailed survey preliminary survey, map study, reconnaissance and detailed survey map study, reconnaissance, preliminary survey and detailed survey ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The suitable surfacing material for a bridge deck slab is sheet asphalt rolled asphalt bituminous carpet mastic asphalt sheet asphalt rolled asphalt bituminous carpet mastic asphalt ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The camber of road should be approximately equal to longitudinal gradient half the longitudinal gradient three times the longitudinal gradient two times the longitudinal gradient longitudinal gradient half the longitudinal gradient three times the longitudinal gradient two times the longitudinal gradient ANSWER DOWNLOAD EXAMIANS APP