Highway Engineering When the path travelled along the road surface is more than the circumferential movement of the wheels due to rotation, then it results in revolving slipping skidding turning revolving slipping skidding turning ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum limit of water absorption for aggregate suitable for road construction is 0.4 % 0.8 % 0.6 % 1.0 % 0.4 % 0.8 % 0.6 % 1.0 % ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the average center to center spacing of vehicles is 20 meters, then the basic capacity of a traffic lane at a speed of 50 kmph is 2000 vehicles per hour 2500 vehicles per hour 1000 vehicles per hour 2500 vehicles per day 2000 vehicles per hour 2500 vehicles per hour 1000 vehicles per hour 2500 vehicles per day ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The drain which is provided parallel to roadway to intercept and divert the water from hill slopes is known as Side drain Sloping drain Cross drain Catch-water drain Side drain Sloping drain Cross drain Catch-water drain ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Stopping sight distance is always None of these more than overtaking sight distance equal to overtaking sight distance less than overtaking sight distance None of these more than overtaking sight distance equal to overtaking sight distance less than overtaking sight distance ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Desire lines are plotted in accident studies speed studies traffic volume studies origin and destination studies accident studies speed studies traffic volume studies origin and destination studies ANSWER DOWNLOAD EXAMIANS APP