Highway Engineering The ruling design speed on a National Highway in plain terrain as per IRC recommendations is 120 kmph 100 kmph 60 kmph 80 kmph 120 kmph 100 kmph 60 kmph 80 kmph ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Camber in the road is provided for having proper sight distance counteracting the centrifugal force None of these effective drainage having proper sight distance counteracting the centrifugal force None of these effective drainage ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Reaction time of a driver None of these is same for all speeds decreases with increase in speed increases with increase in speed None of these is same for all speeds decreases with increase in speed increases with increase in speed ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Tie bars in cement concrete pavements are at warping joints contraction joints expansion joints longitudinal joints warping joints contraction joints expansion joints longitudinal joints ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The drain which is provided parallel to roadway to intercept and divert the water from hill slopes is known as Cross drain Catch-water drain Side drain Sloping drain Cross drain Catch-water drain Side drain Sloping drain ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The binder normally used in flexible pavement construction is lime None of these bitumen cement lime None of these bitumen cement ANSWER DOWNLOAD EXAMIANS APP