Highway Engineering Stopping sight distance is always equal to overtaking sight distance less than overtaking sight distance more than overtaking sight distance None of these equal to overtaking sight distance less than overtaking sight distance more than overtaking sight distance None of these ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering When the bituminous surfacing is done on already existing black top road or over existing cement concrete road, the type of treatment given is Spray of emulsion Seal coat Tack coat Prime coat Spray of emulsion Seal coat Tack coat Prime coat ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Creep is the Longitudinal movement of rail Lateral movement of rail Difference in level of two rails Vertical movement of rail Longitudinal movement of rail Lateral movement of rail Difference in level of two rails Vertical movement of rail ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The rail is designated by its weight weight per unit length cross-section length weight weight per unit length cross-section length ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Flexible pavement distribute the wheel load through structural action None of these directly to subgrade through a set of layers to the subgrade through structural action None of these directly to subgrade through a set of layers to the subgrade ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following is known as design capacity ? basic capacity theoretical capacity possible capacity practical capacity basic capacity theoretical capacity possible capacity practical capacity ANSWER DOWNLOAD EXAMIANS APP