Highway Engineering Stopping sight distance is always equal to overtaking sight distance None of these more than overtaking sight distance less than overtaking sight distance equal to overtaking sight distance None of these more than overtaking sight distance less than overtaking sight distance ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The ductility value of bitumen for suitability in road construction should not be less than 30 cm 10 cm 50cm 20 cm 30 cm 10 cm 50cm 20 cm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following is known as design capacity ? practical capacity theoretical capacity basic capacity possible capacity practical capacity theoretical capacity basic capacity possible capacity ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the group index value of subgrade is between 5 and 9, then the subgrade is treated as very poor fair poor good very poor fair poor good ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The terrain may be classified as rolling terrain if the cross slope of land is upto 10% between 10% and 25% between 25% and 60% more than 60% upto 10% between 10% and 25% between 25% and 60% more than 60% ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum limit of water absorption for aggregate suitable for road construction is 0.4 % 1.0 % 0.8 % 0.6 % 0.4 % 1.0 % 0.8 % 0.6 % ANSWER DOWNLOAD EXAMIANS APP