Highway Engineering Stopping sight distance is always more than overtaking sight distance less than overtaking sight distance None of these equal to overtaking sight distance more than overtaking sight distance less than overtaking sight distance None of these equal to overtaking sight distance ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The suitable surfacing material for a bridge deck slab is bituminous carpet sheet asphalt mastic asphalt rolled asphalt bituminous carpet sheet asphalt mastic asphalt rolled asphalt ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In the penetration macadam construction, the bitumen is Sprayed after the aggregates are spread and compacted Sprayed before the aggregates are spread and compacted None of these Premixed with aggregates and then spread Sprayed after the aggregates are spread and compacted Sprayed before the aggregates are spread and compacted None of these Premixed with aggregates and then spread ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The camber of road should be approximately equal to two times the longitudinal gradient half the longitudinal gradient longitudinal gradient three times the longitudinal gradient two times the longitudinal gradient half the longitudinal gradient longitudinal gradient three times the longitudinal gradient ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In hill roads the side drains arc provided only on the hill side of road on both sides of road only on the opposite side of hill None of these only on the hill side of road on both sides of road only on the opposite side of hill None of these ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering When two equally important roads cross roughly at right angles, the suitable shape of central island is tangent elliptical turbine circular tangent elliptical turbine circular ANSWER DOWNLOAD EXAMIANS APP