Highway Engineering Creep is the Lateral movement of rail Longitudinal movement of rail Vertical movement of rail Difference in level of two rails Lateral movement of rail Longitudinal movement of rail Vertical movement of rail Difference in level of two rails ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Study the following statements regarding creep. i) Creep is greater on curves than on tangent railway track, ii) Creep in new rails is more than that in old rails, iii) Creep is more on steep gradients than on level track. The correct answer is (ii) and (iii) (i)and(ii) only (i) (i), (ii) and (iii) (ii) and (iii) (i)and(ii) only (i) (i), (ii) and (iii) ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following represents hardest grade of bitumen ? 100/120 80/100 60/70 30/40 100/120 80/100 60/70 30/40 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum spacing of contraction joints in rigid pavements is 3.5 m 5.5m 4.5 m 2.5 m 3.5 m 5.5m 4.5 m 2.5 m ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following tests measures the toughness of road aggregates ? impact test shape test abrasion test crushing strength test impact test shape test abrasion test crushing strength test ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Centre line markings are used to designate traffic lanes in roadways meant for two way traffic to indicate that overtaking is not permitted to designate proper lateral placement of vehicles before turning to different directions to designate traffic lanes in roadways meant for two way traffic to indicate that overtaking is not permitted to designate proper lateral placement of vehicles before turning to different directions ANSWER DOWNLOAD EXAMIANS APP