Highway Engineering Creep is the Vertical movement of rail Lateral movement of rail Difference in level of two rails Longitudinal movement of rail Vertical movement of rail Lateral movement of rail Difference in level of two rails Longitudinal movement of rail ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For a constant value of coefficient of lateral friction, the value of required super-elevation increases with decrease in both speed and radius of curve decrease in speed and with increase in radius of curve increase in speed and with decrease in radius of curve increase in both speed and radius of curve decrease in both speed and radius of curve decrease in speed and with increase in radius of curve increase in speed and with decrease in radius of curve increase in both speed and radius of curve ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following methods is preferred for collecting origin and destination data for a small area like a mass business center or a large intersection ? home interview method return postcard method license plate method road side interview method home interview method return postcard method license plate method road side interview method ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The direct interchange ramp involves diverging to the left side and merging from left diverging to the right side and merging from right diverging to the right side and merging from left diverging to the left side and merging from right diverging to the left side and merging from left diverging to the right side and merging from right diverging to the right side and merging from left diverging to the left side and merging from right ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Study the following statements regarding creep. i) Creep is greater on curves than on tangent railway track, ii) Creep in new rails is more than that in old rails, iii) Creep is more on steep gradients than on level track. The correct answer is only (i) (ii) and (iii) (i), (ii) and (iii) (i)and(ii) only (i) (ii) and (iii) (i), (ii) and (iii) (i)and(ii) ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Normally maximum cant permissible in Meter Gauge is 165 mm 75 mm 90 mm 140 mm 165 mm 75 mm 90 mm 140 mm ANSWER DOWNLOAD EXAMIANS APP