Highway Engineering Creep is the Lateral movement of rail Longitudinal movement of rail Vertical movement of rail Difference in level of two rails Lateral movement of rail Longitudinal movement of rail Vertical movement of rail Difference in level of two rails ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The sequence of four stages of survey in a highway alignment is map study, reconnaissance, preliminary survey and detailed survey reconnaissance, map study, preliminary survey and detailed survey map study, preliminary survey, reconnaissance and detailed survey preliminary survey, map study, reconnaissance and detailed survey map study, reconnaissance, preliminary survey and detailed survey reconnaissance, map study, preliminary survey and detailed survey map study, preliminary survey, reconnaissance and detailed survey preliminary survey, map study, reconnaissance and detailed survey ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The most suitable equipment for compacting clayey soils is a vibrator pneumatic tyred roller sheep foot roller smooth wheeled roller vibrator pneumatic tyred roller sheep foot roller smooth wheeled roller ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum number of vehicles beyond which the rotary may not function efficiently is 5000 vehicles per hour 5000 vehicles per day 500 vehicles per day 500 vehicles per hour 5000 vehicles per hour 5000 vehicles per day 500 vehicles per day 500 vehicles per hour ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The stopping sight distance depends upon All of these total reaction time of driver speed of vehicle efficiency of brakes All of these total reaction time of driver speed of vehicle efficiency of brakes ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Compared to a level surface, on a descending gradient the stopping sight distance is less dependent on the speed more same less dependent on the speed more same ANSWER DOWNLOAD EXAMIANS APP