Highway Engineering Creep is the Lateral movement of rail Difference in level of two rails Longitudinal movement of rail Vertical movement of rail Lateral movement of rail Difference in level of two rails Longitudinal movement of rail Vertical movement of rail ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Normally maximum cant permissible in Meter Gauge is 90 mm 75 mm 140 mm 165 mm 90 mm 75 mm 140 mm 165 mm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The sequence of four stages of survey in a highway alignment is reconnaissance, map study, preliminary survey and detailed survey preliminary survey, map study, reconnaissance and detailed survey map study, preliminary survey, reconnaissance and detailed survey map study, reconnaissance, preliminary survey and detailed survey reconnaissance, map study, preliminary survey and detailed survey preliminary survey, map study, reconnaissance and detailed survey map study, preliminary survey, reconnaissance and detailed survey map study, reconnaissance, preliminary survey and detailed survey ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The maximum number of vehicles beyond which the rotary may not function efficiently is 500 vehicles per day 5000 vehicles per day 500 vehicles per hour 5000 vehicles per hour 500 vehicles per day 5000 vehicles per day 500 vehicles per hour 5000 vehicles per hour ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The desirable length of overtaking zone as per IRC recommendation is equal to overtaking sight distance five times the overtaking sight distance three times the overtaking sight distance two times the overtaking sight distance overtaking sight distance five times the overtaking sight distance three times the overtaking sight distance two times the overtaking sight distance ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Most suitable material for highway embankments is granular soil clays organic soil silts granular soil clays organic soil silts ANSWER DOWNLOAD EXAMIANS APP