Highway Engineering Most suitable material for highway embankments is granular soil organic soil silts clays granular soil organic soil silts clays ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The sequence of four stages of survey in a highway alignment is preliminary survey, map study, reconnaissance and detailed survey map study, preliminary survey, reconnaissance and detailed survey map study, reconnaissance, preliminary survey and detailed survey reconnaissance, map study, preliminary survey and detailed survey preliminary survey, map study, reconnaissance and detailed survey map study, preliminary survey, reconnaissance and detailed survey map study, reconnaissance, preliminary survey and detailed survey reconnaissance, map study, preliminary survey and detailed survey ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Number of cotters used in CST-9 sleepers is 5 2 3 4 5 2 3 4 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following methods is preferred for collecting origin and destination data for a small area like a mass business center or a large intersection ? road side interview method return postcard method home interview method license plate method road side interview method return postcard method home interview method license plate method ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Softening point of bitumen to be used for read construction at a place where maximum temperature is 40° C should be greater than 40°C equal to 40°C less-than 40°C None of these greater than 40°C equal to 40°C less-than 40°C None of these ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The camber for hill roads in case of bituminous surfacing is adopted as 0.03 0.025 0.02 0.04 0.03 0.025 0.02 0.04 ANSWER DOWNLOAD EXAMIANS APP