Highway Engineering Most suitable material for highway embankments is silts clays organic soil granular soil silts clays organic soil granular soil ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Stopping sight distance is always more than overtaking sight distance equal to overtaking sight distance less than overtaking sight distance None of these more than overtaking sight distance equal to overtaking sight distance less than overtaking sight distance None of these ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Los Angeles testing machine is used to conduct Attrition test Impact test Abrasion test Crushing strength test Attrition test Impact test Abrasion test Crushing strength test ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For a 8° curve track diverging from a main curve of 5° in an opposite direction in the layout of a broad gauge yard, the cant to be provided for the branch track for maximum speed of 45 km/h on the main line and ‘G’ = 1.676 m is (Permitted cant deficiency for the main line = 7.6 cm) 7.432 cm -0.168 cm 7.768 cm 0.168 cm 7.432 cm -0.168 cm 7.768 cm 0.168 cm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The camber of shoulders in water bound macadam roads is equal to the cross slope of pavement zero less than the cross slope of pavement greater than the cross slope of pavement equal to the cross slope of pavement zero less than the cross slope of pavement greater than the cross slope of pavement ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the stopping distance is 60 meters, then the minimum stopping sight distance for two lane, two way traffic is 180m 30m 60m 120m 180m 30m 60m 120m ANSWER DOWNLOAD EXAMIANS APP