Highway Engineering The thickness of bituminous carpet varies from 100 to 120 mm 20 to 25 mm 75 to 100 mm 50 to 75 mm 100 to 120 mm 20 to 25 mm 75 to 100 mm 50 to 75 mm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering When semaphore and warner are installed on the same post, then the stop indication is given when both arms are horizontal both semaphore and warner arms lowered None of these semaphore arm lowered but warner arm horizontal both arms are horizontal both semaphore and warner arms lowered None of these semaphore arm lowered but warner arm horizontal ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The percentage compensation in gradient for ruling gradient of 4% and horizontal curve of radius 760 m is 10% 1 % 0.1 % no compensation 10% 1 % 0.1 % no compensation ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The fundamental factor in the selection of pavement type is type and intensity of traffic subgrade soil and drainage conditions climatic condition availability of funds for the construction project type and intensity of traffic subgrade soil and drainage conditions climatic condition availability of funds for the construction project ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The recommended grade of tar for grouting purpose is RT-3 RT-5 RT-2 RT-1 RT-3 RT-5 RT-2 RT-1 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering With increase in speed of the traffic stream, the maximum capacity of the lane decreases increases first decreases and then increases after reaching a minimum value at optimum speed first increases and then decreases after reaching a maximum value at optimum speed decreases increases first decreases and then increases after reaching a minimum value at optimum speed first increases and then decreases after reaching a maximum value at optimum speed ANSWER DOWNLOAD EXAMIANS APP