Highway Engineering The thickness of bituminous carpet varies from 100 to 120 mm 50 to 75 mm 75 to 100 mm 20 to 25 mm 100 to 120 mm 50 to 75 mm 75 to 100 mm 20 to 25 mm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Creep is the Vertical movement of rail Lateral movement of rail Difference in level of two rails Longitudinal movement of rail Vertical movement of rail Lateral movement of rail Difference in level of two rails Longitudinal movement of rail ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering When a number of roads are meeting at a point and only one of the roads is important, then the suitable shape of rotary is tangent elliptical circular turbine tangent elliptical circular turbine ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The group index for a soil, whose liquid limit is 40 percent, plasticity index is 10 percent and percentage passing 75 micron IS sieve is 35, is 3 7 5 0 3 7 5 0 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is dry rolling, wet rolling, application of screening and application of filler dry rolling, application of screening, wet rolling and application of filler dry rolling, application of filler, wet rolling and application of screening dry rolling, application of screening, application of filler and wet rolling dry rolling, wet rolling, application of screening and application of filler dry rolling, application of screening, wet rolling and application of filler dry rolling, application of filler, wet rolling and application of screening dry rolling, application of screening, application of filler and wet rolling ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Desire lines are plotted in speed studies origin and destination studies traffic volume studies accident studies speed studies origin and destination studies traffic volume studies accident studies ANSWER DOWNLOAD EXAMIANS APP