Highway Engineering The thickness of bituminous carpet varies from 75 to 100 mm 50 to 75 mm 100 to 120 mm 20 to 25 mm 75 to 100 mm 50 to 75 mm 100 to 120 mm 20 to 25 mm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The direct interchange ramp involves diverging to the left side and merging from left diverging to the left side and merging from right diverging to the right side and merging from left diverging to the right side and merging from right diverging to the left side and merging from left diverging to the left side and merging from right diverging to the right side and merging from left diverging to the right side and merging from right ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Coefficient of friction is less when the pavement surface is smooth and wet dry smooth and dry rough smooth and wet dry smooth and dry rough ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In the penetration macadam construction, the bitumen is Sprayed after the aggregates are spread and compacted None of these Sprayed before the aggregates are spread and compacted Premixed with aggregates and then spread Sprayed after the aggregates are spread and compacted None of these Sprayed before the aggregates are spread and compacted Premixed with aggregates and then spread ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The attainment of super elevation by rotation of pavement about the inner edge of the pavement avoids the drainage problem in flat terrain is preferable in steep terrain does not change the vertical alignment of road results in balancing the earthwork avoids the drainage problem in flat terrain is preferable in steep terrain does not change the vertical alignment of road results in balancing the earthwork ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The fundamental factor in the selection of pavement type is subgrade soil and drainage conditions climatic condition availability of funds for the construction project type and intensity of traffic subgrade soil and drainage conditions climatic condition availability of funds for the construction project type and intensity of traffic ANSWER DOWNLOAD EXAMIANS APP