Highway Engineering The thickness of bituminous carpet varies from 100 to 120 mm 75 to 100 mm 20 to 25 mm 50 to 75 mm 100 to 120 mm 75 to 100 mm 20 to 25 mm 50 to 75 mm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the stopping distance is 60 meters, then the minimum stopping sight distance for two lane, two way traffic is 30m 60m 180m 120m 30m 60m 180m 120m ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For the design of super elevation for mixed traffic conditions, the speed is reduced by 20% 25% 15% 75% 20% 25% 15% 75% ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Softening point of bitumen to be used for read construction at a place where maximum temperature is 40° C should be greater than 40°C equal to 40°C less-than 40°C None of these greater than 40°C equal to 40°C less-than 40°C None of these ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The desirable length of overtaking zone as per IRC recommendation is equal to three times the overtaking sight distance two times the overtaking sight distance five times the overtaking sight distance overtaking sight distance three times the overtaking sight distance two times the overtaking sight distance five times the overtaking sight distance overtaking sight distance ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The binder normally used in flexible pavement construction is bitumen None of these lime cement bitumen None of these lime cement ANSWER DOWNLOAD EXAMIANS APP