Highway Engineering Length of a vehicle affects width of shoulders and parking facilities extra width of pavement and minimum turning radius clearance to be provided under structures such as overbridges, under-bridges etc. width of traffic lanes width of shoulders and parking facilities extra width of pavement and minimum turning radius clearance to be provided under structures such as overbridges, under-bridges etc. width of traffic lanes ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following represents a carpet of sand-bitumen mix without coarse aggregates ? bituminous concrete mastic asphalt bituminous carpet sheet asphalt bituminous concrete mastic asphalt bituminous carpet sheet asphalt ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering On a horizontal curve if the pavement is kept horizontal across the alignment, then the pressure on the outer wheels will be less than the pressure on inner wheels equal to the pressure on inner wheels zero more than the pressure on inner wheels less than the pressure on inner wheels equal to the pressure on inner wheels zero more than the pressure on inner wheels ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In soils having same values of plasticity index, if liquid limit is increased, then Compressibility and permeability decrease and dry strength increases Compressibility, permeability and dry strength increase Compressibility, permeability and dry strength decrease Compressibility and permeability increase and dry strength decreases Compressibility and permeability decrease and dry strength increases Compressibility, permeability and dry strength increase Compressibility, permeability and dry strength decrease Compressibility and permeability increase and dry strength decreases ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The sequence of four stages of survey in a highway alignment is preliminary survey, map study, reconnaissance and detailed survey reconnaissance, map study, preliminary survey and detailed survey map study, preliminary survey, reconnaissance and detailed survey map study, reconnaissance, preliminary survey and detailed survey preliminary survey, map study, reconnaissance and detailed survey reconnaissance, map study, preliminary survey and detailed survey map study, preliminary survey, reconnaissance and detailed survey map study, reconnaissance, preliminary survey and detailed survey ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Number of cotters used in CST-9 sleepers is 3 4 2 5 3 4 2 5 ANSWER DOWNLOAD EXAMIANS APP