Highway Engineering Which of the following is known as design capacity ? possible capacity basic capacity practical capacity theoretical capacity possible capacity basic capacity practical capacity theoretical capacity ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Bitumen of grade 80/100 means its penetration value is 8 to 10 cm its penetration value is 10 mm its penetration value is 8 mm its penetration value is 8 to 10 mm its penetration value is 8 to 10 cm its penetration value is 10 mm its penetration value is 8 mm its penetration value is 8 to 10 mm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following turnouts is most commonly used for goods train on Indian Railways ? 1 in 20 1 in 12 1 in 8’/2 1 in 16 1 in 20 1 in 12 1 in 8’/2 1 in 16 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The direct interchange ramp involves diverging to the right side and merging from left diverging to the left side and merging from right diverging to the right side and merging from right diverging to the left side and merging from left diverging to the right side and merging from left diverging to the left side and merging from right diverging to the right side and merging from right diverging to the left side and merging from left ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In case of hill roads, the extra widening is generally provided equally on inner and outer sides of the curve one-fourth on inner side and three-fourth on outer side of the curve fully on the outer side of the curve fully on the inner side of the curve equally on inner and outer sides of the curve one-fourth on inner side and three-fourth on outer side of the curve fully on the outer side of the curve fully on the inner side of the curve ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Select the correct statement. All of these More the value of CBR, greater thickness of pavement will be required More the value of group index, less thickness of pavement will be required Minimum and maximum values of group index can be 0 and 20 respectively All of these More the value of CBR, greater thickness of pavement will be required More the value of group index, less thickness of pavement will be required Minimum and maximum values of group index can be 0 and 20 respectively ANSWER DOWNLOAD EXAMIANS APP