Highway Engineering Which of the following is known as design capacity ? possible capacity practical capacity basic capacity theoretical capacity possible capacity practical capacity basic capacity theoretical capacity ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is dry rolling, wet rolling, application of screening and application of filler dry rolling, application of screening, application of filler and wet rolling dry rolling, application of screening, wet rolling and application of filler dry rolling, application of filler, wet rolling and application of screening dry rolling, wet rolling, application of screening and application of filler dry rolling, application of screening, application of filler and wet rolling dry rolling, application of screening, wet rolling and application of filler dry rolling, application of filler, wet rolling and application of screening ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In hill roads the side drains arc provided on both sides of road None of these only on the hill side of road only on the opposite side of hill on both sides of road None of these only on the hill side of road only on the opposite side of hill ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In case of hill roads, the extra widening is generally provided fully on the inner side of the curve fully on the outer side of the curve equally on inner and outer sides of the curve one-fourth on inner side and three-fourth on outer side of the curve fully on the inner side of the curve fully on the outer side of the curve equally on inner and outer sides of the curve one-fourth on inner side and three-fourth on outer side of the curve ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The effect of grade on safe overtaking sight distance is to increase it on both descending and ascending grades to decrease it on descending grades and to increase it on ascending grades to increase it on descending grades and to decrease it on ascending grades to decrease it on both descending and ascending grades to increase it on both descending and ascending grades to decrease it on descending grades and to increase it on ascending grades to increase it on descending grades and to decrease it on ascending grades to decrease it on both descending and ascending grades ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In highway construction, rolling starts from Sides and proceed to center One side and proceed to other side Any of the above Center and proceed to sides Sides and proceed to center One side and proceed to other side Any of the above Center and proceed to sides ANSWER DOWNLOAD EXAMIANS APP