Highway Engineering The rail is designated by its weight per unit length weight cross-section length weight per unit length weight cross-section length ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering When the bituminous surfacing is done on already existing black top road or over existing cement concrete road, the type of treatment given is Seal coat Prime coat Tack coat Spray of emulsion Seal coat Prime coat Tack coat Spray of emulsion ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Bitumen of grade 80/100 means its penetration value is 8 to 10 cm its penetration value is 10 mm its penetration value is 8 to 10 mm its penetration value is 8 mm its penetration value is 8 to 10 cm its penetration value is 10 mm its penetration value is 8 to 10 mm its penetration value is 8 mm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In CBR test the value of CBR is calculated at both 2.5 mm and 5.0 mm penetrations 2.5 mm penetration only 7.5 mm penetration only 5.0 mm penetration only both 2.5 mm and 5.0 mm penetrations 2.5 mm penetration only 7.5 mm penetration only 5.0 mm penetration only ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In highway construction, rolling starts from Sides and proceed to center Center and proceed to sides Any of the above One side and proceed to other side Sides and proceed to center Center and proceed to sides Any of the above One side and proceed to other side ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For rapid curing cutbacks, the oil used is gasoline heavy diesel light diesel kerosene oil gasoline heavy diesel light diesel kerosene oil ANSWER DOWNLOAD EXAMIANS APP