Highway Engineering If the average center to center spacing of vehicles is 20 meters, then the basic capacity of a traffic lane at a speed of 50 kmph is 1000 vehicles per hour 2500 vehicles per day 2500 vehicles per hour 2000 vehicles per hour 1000 vehicles per hour 2500 vehicles per day 2500 vehicles per hour 2000 vehicles per hour ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The sequence of four stages of survey in a highway alignment is map study, preliminary survey, reconnaissance and detailed survey reconnaissance, map study, preliminary survey and detailed survey map study, reconnaissance, preliminary survey and detailed survey preliminary survey, map study, reconnaissance and detailed survey map study, preliminary survey, reconnaissance and detailed survey reconnaissance, map study, preliminary survey and detailed survey map study, reconnaissance, preliminary survey and detailed survey preliminary survey, map study, reconnaissance and detailed survey ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The most efficient traffic signal system is alternate system flexible progressive system simple progressive system simultaneous system alternate system flexible progressive system simple progressive system simultaneous system ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The desirable length of overtaking zone as per IRC recommendation is equal to overtaking sight distance two times the overtaking sight distance three times the overtaking sight distance five times the overtaking sight distance overtaking sight distance two times the overtaking sight distance three times the overtaking sight distance five times the overtaking sight distance ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering With increase in speed of the traffic stream, the maximum capacity of the lane first decreases and then increases after reaching a minimum value at optimum speed increases first increases and then decreases after reaching a maximum value at optimum speed decreases first decreases and then increases after reaching a minimum value at optimum speed increases first increases and then decreases after reaching a maximum value at optimum speed decreases ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Highway facilities are designed for thirtieth highest hourly volume annual average hourly volume peak hourly volume of the year annual average daily traffic thirtieth highest hourly volume annual average hourly volume peak hourly volume of the year annual average daily traffic ANSWER DOWNLOAD EXAMIANS APP