Highway Engineering For rapid curing cutbacks, the oil used is light diesel kerosene oil heavy diesel gasoline light diesel kerosene oil heavy diesel gasoline ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In the penetration macadam construction, the bitumen is Premixed with aggregates and then spread None of these Sprayed after the aggregates are spread and compacted Sprayed before the aggregates are spread and compacted Premixed with aggregates and then spread None of these Sprayed after the aggregates are spread and compacted Sprayed before the aggregates are spread and compacted ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following represents hardest grade of bitumen ? 30/40 100/120 60/70 80/100 30/40 100/120 60/70 80/100 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the stopping distance is 60 meters, then the minimum stopping sight distance for two lane, two way traffic is 120m 30m 180m 60m 120m 30m 180m 60m ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering In highway construction on super elevated curves, the rolling shall proceed from centre towards the sides lower edge towards the upper edge upper edge towards the lower edge sides towards the centre centre towards the sides lower edge towards the upper edge upper edge towards the lower edge sides towards the centre ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering As per IRC recommendations, the maximum limit of super elevation for mixed traffic in plain terrain is 1 in 15 1 in 10 equal to camber 1 in 12.5 1 in 15 1 in 10 equal to camber 1 in 12.5 ANSWER DOWNLOAD EXAMIANS APP