Highway Engineering Which of the following turnouts is most commonly used for goods train on Indian Railways ? 1 in 12 1 in 16 1 in 20 1 in 8’/2 1 in 12 1 in 16 1 in 20 1 in 8’/2 ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The stopping sight distance depends upon total reaction time of driver speed of vehicle All of these efficiency of brakes total reaction time of driver speed of vehicle All of these efficiency of brakes ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The walls which are necessary on the hill side of roadway where earth has to be retained from slipping is known as breast wall retaining wall None of these parapet wall breast wall retaining wall None of these parapet wall ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering “Dead Slow” is a warning sign None of these informatory sign regulatory sign warning sign None of these informatory sign regulatory sign ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The sequence of four stages of survey in a highway alignment is map study, reconnaissance, preliminary survey and detailed survey preliminary survey, map study, reconnaissance and detailed survey map study, preliminary survey, reconnaissance and detailed survey reconnaissance, map study, preliminary survey and detailed survey map study, reconnaissance, preliminary survey and detailed survey preliminary survey, map study, reconnaissance and detailed survey map study, preliminary survey, reconnaissance and detailed survey reconnaissance, map study, preliminary survey and detailed survey ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Maximum daily traffic capacity of bituminous pavements is 1500 tonnes per day 500 tonnes per day 2000 tonnes per day 1000 tonnes per day 1500 tonnes per day 500 tonnes per day 2000 tonnes per day 1000 tonnes per day ANSWER DOWNLOAD EXAMIANS APP