Highway Engineering To calculate the minimum value of ruling radius of horizontal curves in plains, the design speed is given by 12kmph 8 kmph 16kmph 20 kmph 12kmph 8 kmph 16kmph 20 kmph ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The ductility value of bitumen for suitability in road construction should not be less than 20 cm 10 cm 50cm 30 cm 20 cm 10 cm 50cm 30 cm ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Which of the following represents a carpet of sand-bitumen mix without coarse aggregates ? sheet asphalt mastic asphalt bituminous carpet bituminous concrete sheet asphalt mastic asphalt bituminous carpet bituminous concrete ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For highway geometric design purposes the speed used is 85th percentile 98 “”percentile 15th percentile 50 “”percentile 85th percentile 98 “”percentile 15th percentile 50 “”percentile ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The sequence of four stages of survey in a highway alignment is map study, reconnaissance, preliminary survey and detailed survey preliminary survey, map study, reconnaissance and detailed survey map study, preliminary survey, reconnaissance and detailed survey reconnaissance, map study, preliminary survey and detailed survey map study, reconnaissance, preliminary survey and detailed survey preliminary survey, map study, reconnaissance and detailed survey map study, preliminary survey, reconnaissance and detailed survey reconnaissance, map study, preliminary survey and detailed survey ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering Highway facilities are designed for peak hourly volume of the year thirtieth highest hourly volume annual average hourly volume annual average daily traffic peak hourly volume of the year thirtieth highest hourly volume annual average hourly volume annual average daily traffic ANSWER DOWNLOAD EXAMIANS APP