Highway Engineering The camber of road should be approximately equal to half the longitudinal gradient two times the longitudinal gradient longitudinal gradient three times the longitudinal gradient half the longitudinal gradient two times the longitudinal gradient longitudinal gradient three times the longitudinal gradient ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For design, that length of transition curve should be taken which is smaller of (A) and (B) based on allowable rate of change of centrifugal acceleration based on rate of change of super elevation higher of (A) and (B) smaller of (A) and (B) based on allowable rate of change of centrifugal acceleration based on rate of change of super elevation higher of (A) and (B) ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering If the stopping distance is 60 meters, then the minimum stopping sight distance for two lane, two way traffic is 180m 60m 30m 120m 180m 60m 30m 120m ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering The drain which is provided parallel to roadway to intercept and divert the water from hill slopes is known as Sloping drain Catch-water drain Side drain Cross drain Sloping drain Catch-water drain Side drain Cross drain ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For a constant value of coefficient of lateral friction, the value of required super-elevation increases with decrease in speed and with increase in radius of curve increase in speed and with decrease in radius of curve decrease in both speed and radius of curve increase in both speed and radius of curve decrease in speed and with increase in radius of curve increase in speed and with decrease in radius of curve decrease in both speed and radius of curve increase in both speed and radius of curve ANSWER DOWNLOAD EXAMIANS APP
Highway Engineering For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is dry rolling, application of filler, wet rolling and application of screening dry rolling, application of screening, application of filler and wet rolling dry rolling, wet rolling, application of screening and application of filler dry rolling, application of screening, wet rolling and application of filler dry rolling, application of filler, wet rolling and application of screening dry rolling, application of screening, application of filler and wet rolling dry rolling, wet rolling, application of screening and application of filler dry rolling, application of screening, wet rolling and application of filler ANSWER DOWNLOAD EXAMIANS APP